Results per page: 10 | 25 | 50 15 Preguntas found, displaying 1 to 10.[First/Prev] 1, 2 [Next/Last]
# Pregunta Respuesta Fecha de la última publicación Estado
15
Is additional modelling (1D, 2D, 3D) of water balance parameters (e.g. river discharge, sub-surface flow [...]
As mentioned page 13 of the technical specifications, the tenderer should describe the procedure to reconstruct [...]
13/05/2013
14
What is the required resolution for the water balances? Are they to be submitted on sub-basin level ( [...]
Water balances have to be produced at sub-basin level. Shape files from the previous contract, ECRINS [...]
13/05/2013
13
Can we obtain the ecological and chemical status of the sub-basins from the WFD?
All available data on ecological and chemical status from WFD reporting and from SoE process will be [...]
13/05/2013
12
Is it possible for the client to estimate the percentage of water balance data that is still missing [...]
This depends on the parameter. Please refer to the EEA report to WFD-CIS Strategic Coordination Group [...]
13/05/2013
11
The former contracts/pilots only provided only 8 years of water balances while the objective was to report [...]
The calculation of water balances was done for an average of 8 years because of insufficient data either [...]
13/05/2013
10
Please provide additional insight in to the amount of work that is to be expected to make the databases [...]
The objective of the tender and the tasks are clear and cannot be modified. The gaps are precisely described [...]
13/05/2013
9
In the tender specifications it is specified on page 13 under task 2 sub 1: "The contractor should revise [...]
As mentioned in the tender specification some inconsistencies with the water bodies between Ecrins and [...]
13/05/2013
8
Aside from the existing databases, can we also make use of the instruments (like NOPULU System and AQUATOOL [...]
The mentioned tools were used by former contractors for the production of water accounts. The tenderer [...]
13/05/2013
7
Which basins from part of the group ‘best documented basins’ for which at least it is required to produce [...]
the question raise concerns on the proper understanding of what is required in the technical specifications [...]
13/05/2013
6
Do the water balances have to be produced on sub-basin level and then being aggregated to basin level [...]
Water balances have to be produced at sub-basin level, enabling further aggregation at river basin district [...]
13/05/2013