Informaciones de las convocatorias de concurso

Título:
Prestación de servicios de comunicaciones por satélite para los sistemas de aero...
Poder adjudicador:
European Maritime Safety Agency
Fecha de publicación del TED:
31/03/2018
Fecha límite de recepción de las ofertas:
21/05/2018
Estado:
Cerrada
Mostrar los parámetros del filtro

Results per page: 10 | 25 | 50 45 Preguntas found, displaying 31 to 40.[First/Prev] 1, 2, 3, 4, 5 [Next/Last]
# Pregunta Respuesta Fecha de la última publicación Estado
15
Is it possible to make an inspection on site for a better understanding of installation, configuration [...]
An on-site inspection is not available during the tender process. Note that the sites themselves are [...]
23/04/2018
14
With reference to EN-03 Tender Specifications Appendix 1 Technical Specifications.pdf section 2.1.1, [...]
It is the Bidders choice to use the same SATCOM terminal for the primary and the secondary Command and [...]
23/04/2018
13
With reference to EN-03 Tender Specifications Appendix 1 Technical Specifications.pdf section 2.1.1, [...]
The latency requirement of 2s shall be maintained at least between the RPAS and the LGCS. The Agency [...]
23/04/2018
12
Concerning Appendix 1 point 2.4.: How many SATCOM terminals have to be provided for each size (medium [...]
There is no minimum nor maximum number of terminals that must be offered per category. Offers will be [...]
23/04/2018
11
Concerning point 15.4: what are the criteria adopted for assessing the financial capacity? What is the [...]
The basic method is the analysis of the tenderer’s annual accounts (or financial statements). The financial [...]
23/04/2018
10
a) Will EMSA please verify the SATCOM equipment the vendors propose for Lot 1, (2 Mbps data rate) is [...]
a) In principle both lots are intended for fixed wing RPAS. The Agency's current platforms are medium [...]
20/04/2018
9
As some French overseas territories are included in the EU territory according to international treaties [...]
As per Tender Specifications: 1.1.8 and Appendix 1: 2.1: Areas of operation can be all sea areas surrounding [...]
20/04/2018
8
Are there alreary routers, and of which type, aboard the current fleet of RPAS ? Will it be the responsibility [...]
The Agency operates with different RPAS platforms, most of them already have routers on-board to distribute [...]
20/04/2018
7
Can you confirm: - The method used to evaluate the link availability (exclusions, periods of time to [...]
-The Bidders can select the method that they consider more suitable to evaluate the link availability [...]
20/04/2018
6
To provide an offer in Mbps, it is required to establish a link budget. Can you provide details about [...]
The details of the terminals currently used by the Agency can not be provided. The terminal requirements [...]
20/04/2018