Pakkumiskutse andmed

See new version of Price schedule and Estimation Form in the document library
Pealkiri:
AO 10653 – toimetamise abi ELi õigusaktide kokkuvõtete kogu tootmisel, tõlkimise...
Tellija:
Publications Office of the European Union (OP)
TEDis avaldamise kuupäev:
27/07/2016
Pakkumuste vastuvõtmise tähtaeg:
21/09/2016
Olek:
Suletud
Näita filtreerimisparameetreid

Results per page: 10 | 25 | 50 14 Küsimused found, displaying 1 to 10.[First/Prev] 1, 2 [Next/Last]
# Küsimus Vastus Viimati avaldatud: Olek
14
We believe we have detected a fatal error in the document “AO 10653 - Price schedule_Estimation form_Version [...]
Corrected Estimation Form "Price schedule_Estimation form_Version 3" is available in the document library [...]
16/09/2016
13
Is there an API available for the contractor to integrate into customer's content managment system / [...]
The transmission protocols and the required formats are described in the resources provided in Technical [...]
15/09/2016
12
(1) In these cases will the be a production proposal? (2) If not, will you propose specific things to [...]
(1) No. (2) The production request will specify all necessary elements to enable the contractor to proceed [...]
15/09/2016
11
How will you check whether the proposed prices are abnormally low? What is your approach, methodologies [...]
The proposed prices are compared with the market prices or calculations are made based on publicly available [...]
15/09/2016
10
(1) How can you assess our PRODUCTION management in document 2 if you request a description of the PROJECT [...]
In point 2.7.2 of the Specifications, technical award criterion n° 2): Instead of : Appropriateness of [...]
15/09/2016
9
We understand that the “maximum of 3,000 characters with spaces per page” (referred to on page 17 of [...]
Your understanding is not correct. This requirement has been established for the sake of clarity and [...]
06/09/2016
8
The contract notice indicates (on page 4) that the tenders will be opened on 27/09/2016 at 10.00 a.m. [...]
The opening will take place on 27/09/2016 at 11.00 a.m. Please note that a corrigendum to the contract [...]
06/09/2016
7
Annex 7, under capital, asks for subscribed capital and paid up capital. Under the Belgian system, these [...]
The figures indicated must be in conformity to the facts.
01/09/2016
6
We note that the requirement for translation work ("At least one PARF showing translation into 7 languages [...]
The published requirements are binding and cannot be changed during the procurement procedure.
29/08/2016
5
Tenderers are required to submit: “At least one (1) of PARF showing legal expertise and a thorough knowledge [...]
a) Level of legal expertise should be sufficient in order to be able to provide required services (i.e [...]
12/08/2016