Pakkumiskutse andmed

Pealkiri:
Analüüs, millega toetatakse nõukogu direktiivi 2014/87/Euratom artiklite 8a–8c p...
Tellija:
European Commission, DG Energy (ENER)
TEDis avaldamise kuupäev:
13/09/2017
Pakkumuste vastuvõtmise tähtaeg:
17/10/2017
Olek:
Suletud
Näita filtreerimisparameetreid

Results per page: 10 | 25 | 50 11 Küsimused found, displaying 1 to 10.[First/Prev] 1, 2 [Next/Last]
# Küsimus Vastus Viimati avaldatud: Olek
11
Can we submit scanned copies of the signed Annexes (Annex 1-3) and supporting documents (e.g. annual [...]
As indicated in paragraph 2 of the invitation letter, the tender has to be submitted in one original [...]
02/10/2017
8
Is the comparison of the legislation and safety upgrades limited to changes that have been made directly[...]
Please disregard the answer incorrectly published on 27/09/2017. The correct answer is as follows: No[...]
28/09/2017
10
Is there a list of documents related to Directive Articles 8a-8c including the way that the requirements[...]
No. Information from various different sources on these topics as mentioned in section 2.6 is generally[...]
27/09/2017
9
What role would be expected from the contractor in arranging the two workshops required in Work Package[...]
The contractor is expected to organise the workshops as described in section 2.6.
27/09/2017
7
Evidence A1 must provide references from the projects. Is it asking for the details of the projects: [...]
As described in 4.2.4, the tenderer should provide references for three projects delivered in these fields[...]
27/09/2017
6
Would it be acceptable to seek information from the EU Member States using a questionnaire? In similar[...]
Yes.
27/09/2017
5
The Tender documents are available in PDF format only. Could you please provide us with Annex 1 "Identification[...]
The Annexes 1, 2 and 3 have been added in Word format in the Document Library
26/09/2017
4
-Is it a fix price tender i.e. 300K£€?
This is a competitive tender. As indicated in Part E ‘Financial offer’ in section 1.6. of the tender [...]
26/09/2017
3
-Section 2.5 describes the scope of the tasks: A detailed survey and technical evaluation is needed for[...]
The level of detail to be provided for the category of nuclear installations mentioned in the tender [...]
26/09/2017
2
-In section 4.2.4. from the tender specifications, it says that support team (B4) should have at least[...]
This period applies to whole team.
26/09/2017