# Küsimus Vastus Viimati avaldatud: Olek
27
According to Terms of reference, section 6.1 regarding Support staff and backstopping: “Note that the [...]
This is a clarification that the Consultant should not double budget for the support and backstopping [...]
09/01/2020
26
After analyzing the RFP of the tender regarding the Detailed project engineering design, bid documents [...]
Taking into account the constrains form the financing agreement, the deadline cannot be extended.
09/01/2020
25
Due to the reduced effective worktime during Christmas and New Year’s season and the difficulty in finding [...]
Taking into account the constrains form the financing agreement, the deadline cannot be extended.
09/01/2020
24
It is stated that in order to obtain the Environmental Permit the Consultant as a whole and/or the environmental [...]
The registration can be obtained after the signature of the contract but the Consultant is expected to [...]
09/01/2020
23
Regarding the scope of “Annex 7: Urban planning and traffic study”, it is defined the scope of the traffic [...]
The traffic study must be updated
09/01/2020
22
Regarding the scope of “Annex 2: Topographic and bathymetric survey”, it is specified that the consultant [...]
Yes, it must be included
09/01/2020
21
Regarding the scope of “Annex 3: Geological and source materials study”, it is foreseen the development [...]
Yes, it must be included.
09/01/2020
20
Regarding the environmental expert (K3) and its need to be registered in São Tomé (STP), we ask if it [...]
The registration can be obtained after the signature of the contract but the Consultant is expected to [...]
09/01/2020
19
According our understanding of the TOR’s reading, the detailed design reports (including its annexes) [...]
The reports have to be provided at the same time for the 3 road sections. This is splitting of the Marginal [...]
09/01/2020
18
Regarding annex 20 (Land acquisition), should we also consider including copies of the property titles [...]
Yes.
09/01/2020