Pakkumiskutse andmed

Pealkiri:
Rahvalttellimine: kogukondade tulemuslik kaasamine toidu- ja söödariskide hindam...
Tellija:
European Food Safety Authority (EFSA)
TEDis avaldamise kuupäev:
21/10/2015
Pakkumuste vastuvõtmise tähtaeg:
15/01/2016
Olek:
Suletud
Näita filtreerimisparameetreid

Results per page: 10 | 25 | 50 9 Küsimused found, displaying all Küsimused .
# Küsimus Vastus Viimati avaldatud: Olek
9
Dear Sir/Madam, you are requesting: "The tenderer must have generated an overall annual turnover of at [...]
Correction to the first sentence in the answer given above earlier today. The minimum requirement for [...]
08/01/2016
1
In addition, could the requirements Regarding Objective 3, will EFSA specify the topics to be addressed [...]
The topic to be addressed in the two pilot studies will be discussed with EFSA. On the basis of the findings [...]
26/11/2015
5
In relation to 2f: What do "different project types" relate to?
In point 2b the contractor is requested to identify communities and engagement approaches for each relevant [...]
26/11/2015
7
No points seem to be allocated to the methodology for the inventory. Is this correct or is the inventory [...]
The inventory is subsumed within the feasibility study.
07/01/2016
8
Re. the draft contract clause 11.15.1 it is not clear if a Pre-Financing Guarantee and Performance Guarantee [...]
This is EFSA draft standard contract. No pre-financing guarantee or performance guarantee will be required [...]
07/01/2016
3
Regarding Objective 2g), can an overview of EFSA information architecture be made available?
Please find enclosed our catalogue of business identities and the matrix of the business entities and [...]
26/11/2015
4
Should the pilot system cover all kinds of theoretically possible types or only the two chosen for the [...]
The pilot test phase should cover two among the three proposed pilot studies (3a, 3b, 3c).
26/11/2015
6
The pilot study award only mentions the score for the systematic review. Is the 50 points only for the [...]
The 50 points are only referred to the methodology of the systematic review pilot study. Only the methodology [...]
07/01/2016
2
The specifications 2g) will be heavily influenced by EFSA's information architecture, and it is challenging [...]
Point 2g) of the feasibility study should identify the information technology needs for each of the crowdsourcing [...]
26/11/2015