22
|
Can you elaborate how the transition to the failover server is performed today, assuming that both the [...]
|
The transition is not initiated automatically. It involves a decision based on the status of the production [...]
|
10/05/2021
|
|
21
|
Items #9 and #10 in the “statistical data (approximates)” part of the table in Annex K2 are both defined [...]
|
Item #9 should have been labelled: “Total website visits”.
|
10/05/2021
|
|
20
|
Can you please clarify whether the 60 hours per year for the “systems downtime” refers to downtime per [...]
|
Yes, the downtime is per system (60 hours for the Webportal, 60 hours for the CRM, etc). This does not [...]
|
10/05/2021
|
|
19
|
Can you please elaborate on the functionality offered by the proxy VM? Does it include reverse proxy [...]
|
The server's primary function is to cache and log traffic and route it to the infrastructure.
|
10/05/2021
|
|
18
|
In Annex K2, there is a triplet of environments denoted as “Web”, while there is also another triplet [...]
|
Web2 are the test servers which are configured in the same way (triplet) as the production servers in [...]
|
10/05/2021
|
|
17
|
Based on the tender specifications and Annex K1, we understand that the systems in scope can be hosted [...]
|
Yes, your understanding is correct.
|
10/05/2021
|
|
16
|
The requirements state "Post-secondary degree in Computer/Information systems sciences" without mentioning [...]
|
Yes, advanced vocational training in the case of this profile is acceptable.
|
10/05/2021
|
|
15
|
Should case studies address projects with a specific commitment limit, as indicated in the division: [...]
|
The commitment limits mentioned in point 2.4.2 of the Tender Specifications are indicative. It is up [...]
|
04/05/2021
|
|
14
|
The case study task indicated that: 'The tenderer is asked to submit two case studies showcasing each [...]
|
Tenderers are asked to submit two different case studies to showcase their ability in terms of data visualisation [...]
|
04/05/2021
|
|
13
|
According to the tender specifications, "The aim of the contract is the provision of web development, [...]
|
The migration process from version 7 to version 8 is currently being executed and will be finalised in [...]
|
04/05/2021
|
|