# Ceist Freagra Dáta deireanach a fhoilsithe Stádas
86
Definition of sanitary unit: A sanitary unit is a room in your building that contains several toilets [...]
Please see the new annex ‘XIX’ (Specifications of sanitary units) which has been published with additional [...]
13/08/2019
18
Do you prefer one document with all the answers to questions 1 – 8, or do you prefer a separate document [...]
EMA would prefer to receive one document with all the answers.
31/07/2019
75
Does the tenderer correctly understand that in part two a price must be entered for the consumbles requested [...]
Yes, the understanding is correct; the quotes for consumables should not include dispensers.
09/08/2019
6
Does this mean that the window cleaner must clean monthly interior glass and is this included separation [...]
The monthly cleaning services required comprises the internal glazing including separation glass, as [...]
26/07/2019
51
Fixed cost per one pest control visit. Each visit shall cover all aspects of the indicated duties specified [...]
Tenderers are requested to provide a fixed cost per pest control visit where each visit shall cover all [...]
06/08/2019
1
For completing above mentioned annex III, IX and XV can you please send them in word format.
For security reasons, the Agency is unable to provide annexes III, IX and XV in Word format. However, [...]
24/07/2019
78
For the indexation of prices you use a European standard which is serverely different than the usual [...]
Please see the response to question 77.
12/08/2019
33
For the KPI Audit overall score % you refer to a score sheet by which you measure Customer Satisfaction [...]
The score sheet is included in the SLA spreadsheet, please see score input in column K. The scores will [...]
02/08/2019
64
From our own experience we believe that the recycling station in your new building will be too small [...]
Tenderers are requested to present a proposal in line with the Agency requirements. Extra space could [...]
07/08/2019
41
From our own experience we know that a maximum of 1 complaint per month in a building with > 1.000 [...]
Complaints as described in the SLA are not user complaints. User complaints will be channelled through [...]
06/08/2019
97
Hand soap has been added to the Costing sheet in sheet 1 (Cleaning services) in section 2: Consumables [...]
A new costing sheet (v.4) has been published in which the formula is corrected. Tenderers must use this [...]
21/08/2019
38
How many sanitary units will there be in your building, and how many toilet pots and washbasins?
Could the economic operator please clarify what is meant with ‘sanitary units’?
06/08/2019
52
In order to collect waste efficiently we need a minimum of 2 and rather 3 high voltage power connections [...]
As per point d) central waste collection of section 3.1.5 (Waste management including confidential waste [...]
07/08/2019
26
In order to compile a correct list of proposed cleaning products, an overview of the finishing materials [...]
Tenderers should note that the EMA building is still a construction site. The below list of finishing [...]
02/08/2019
93
In order to determine an accurate price for cleaning services, the following information is required: [...]
For the requested information, please see Annex XX: Additional information. Please note that further [...]
20/08/2019
94
In order to provide you with an accurate price for deep cleaning, the following information is required [...]
For the requested information, please see Annex XX: Additional information, which has been published [...]
20/08/2019
68
In question 2 you have given us indicative measures per floor. In this list, the measures of floor 3 [...]
Please see below rectification: Floor 4 to 18: standard offices floors: surface 1,350 – 1,435 m2 + bathrooms [...]
08/08/2019
101
In the 'Technical Specifications' document it is stated that a completed Annex III (Declaration of honour [...]
The e-submission platform is designed in a way that it is compulsory to upload a Declaration on Honour [...]
27/08/2019
46
In the current situation all service desk enquiries (receipt, processing and feedback) are handled by [...]
The Agency considers that this question is not relevant to the submission of a proposal in response to [...]
06/08/2019
7
In the Invitation to tender you mention: "Economic operators interested in this contract are invited [...]
EMA is a multicultural organisation with English as the main working language, and English would therefore [...]
30/07/2019
100
In this section you ask for '1 small clinical waste bin and 1 sharp bin in the first aid room'. These [...]
The Agency cannot remove the supply and servicing of clinical waste bins and sharp bins from the requirements [...]
22/08/2019
99
In this section you ask for '25 x Sharp bins for each disabled toilet'. Are you sure you want sharpbins [...]
The requests for 25 sharp bins for each disabled toilet is based on what was in use in the Agency’s previous [...]
22/08/2019
98
In this section you ask for 47 Enzyme and urinal sleeves for each urinal. Can you specify this product [...]
The urinals are not waterless. The Agency does not prescribe the type of product to be used; this will [...]
22/08/2019
90
In your answer on question 43 you state that the contract start date is foreseen to be 01 December ‘19 [...]
Please see the response to question 87.
13/08/2019
58
In your RFP nothing is mentioned in regard to outside areas. Does this mean that outside areas are not [...]
The annual price for daily cleaning should include the main entrance area, access route, staircases and [...]
07/08/2019