27
|
The article 21º of the DIRECTIVE 2014/24/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 February [...]
|
Please refer to answer provided to part I.
|
05/05/2020
|
|
26
|
MEO – SERVIÇOS DE COMUNICAÇÕES E MULTIMÉDIA, S.A., hereinafter also referred to as “MEO”, a public limited [...]
|
"As a general obligation stemming from the Treaty on the Functioning of the European Union and the Charter [...]
|
05/05/2020
|
|
25
|
The line to connect EMSA BCF and EMSA DC, could be a L3 line (IP or MPLS) or is required to be a L2 connection [...]
|
Line can be L3.
|
05/05/2020
|
|
24
|
On the Internet Connectivity - when filling the 5Gbps solution, the price should be the total amount [...]
|
Price shall be the total amount for the 5Gbps solution. Please note that all prices in the table are [...]
|
05/05/2020
|
|
23
|
Can all documents, that are to be uploaded by the tenderer, be digitally signed? including the ones where [...]
|
"According to Section 3 of Appendix I e-Submission Guidelines attached to the Tender Specifications, [...]
|
05/05/2020
|
|
22
|
The FWC, on I.3.3, states that "The FWC is concluded for a period of 48 months", and on I.3.5 that "The [...]
|
Power upgrades and downgrades shall be considered on a yearly basis (i.e., annual contract anniversary [...]
|
05/05/2020
|
|
21
|
The FWC, on I.3.3, states that "The FWC is concluded for a period of 48 months", and on I.3.5 that "The [...]
|
"Downgrades of physical space can be requested at each annual contract anniversary. The reference to [...]
|
05/05/2020
|
|
20
|
A package of remote hands hours is to be quoted. Is it possible to have a forecast of hours per year? [...]
|
Effective amount of hours consumed per month and per year can vary greatly depending on needs, and there [...]
|
05/05/2020
|
|
19
|
Which physical interfaces are to be considered for the Internet and Connectivity Layer 2? (i.e. 10G base-SR [...]
|
Connectors are specified in the Appendix A of the Tender Specifications attached to the Invitation to [...]
|
05/05/2020
|
|
18
|
Does the maximum budget available include all the posibles renewals?
|
Yes, as per Article I.5.1 (Maximum amount of the FWC and maximum prices) of the draft Framework Contract [...]
|
24/04/2020
|
|