18
|
Tender Specifications Section 2.8.1 (page 18), section 2.8.2, (page 20), Annex 12 "indicative products [...]
|
The expected or valid programming languages are listed among the specific requirement for the Contractor's [...]
|
17/12/2013
|
|
17
|
Dear Sir / Madam, Is it possible to present the CV's of the experts in Spanish language? We will present [...]
|
We confirm it possible to submit CV's in Spanish.
|
17/12/2013
|
|
16
|
Request for clarification concerning questionnaire 14.2, Technical quality of the bid, paragraph 4.2: [...]
|
The tenderers are asked to provide an outline (structure and content) of the proposal, that will be submitted [...]
|
13/12/2013
|
|
15
|
Is it possible to make the updated connection table for staff (Annex 14.1.1) available again for download [...]
|
The documents are available for downloading.
|
11/12/2013
|
|
14
|
Request for clarification, Section 5.3 Technical and professional capacity, page 43 of the Tender Specifications [...]
|
Although Point 5.3 'Section Three: Selection criteria' part b 'Technical and professional capacity' states [...]
|
11/12/2013
|
|
13
|
Request for clarification concerning Section 5.3 Technical and professional capacity, page 42 of the [...]
|
Please follow the instructions of the revised document "Annex-14.1.2 Standardised_CV_form.doc", which [...]
|
11/12/2013
|
|
12
|
Request for clarification concerning the tender specifications, page 44, Section Five Financial Bid and [...]
|
Yes, your understanding is correct, the technical and financial parts of the offer are to be submitted [...]
|
11/12/2013
|
|
11
|
Question to Special Conditions Art. I.8.2, draft framework contract Article I.8.2 specifies "All pre-existing [...]
|
The submission of a tender in response to an invitation to tender issued by the Commission implies that [...]
|
06/12/2013
|
|
10
|
Expert profiles, section 2.8.2 – GIS Junior Consultant, Tender Specification Mapping and Digitization [...]
|
Point 2.8.2 "Expert profiles" includes descriptions with the list of minimum requirements for the expert [...]
|
06/12/2013
|
|
9
|
Both questionaires (14.1 and 14.2) include the same note:”The tenderers are asked to limit the length [...]
|
Question8
|
05/12/2013
|
|