11
|
Technical and Professional Capacity. See TS, §3.2.3, p.46. Question 1. How many 'sample CVs' need to [...]
|
Regarding the CV, at least the CVs of the initial proposed team of 4.1. page 47 should be presented. [...]
|
26/01/2018
|
|
12
|
With reference to Section “2.1 Introduction: Background to the invitation to tender “, of the procurement [...]
|
In case you need to cooperate with other contractors to solve an issue, e.g. you have to submit an incident [...]
|
01/02/2018
|
|
13
|
With reference to section “2.2.7.5 Service level definitions” of the “EN-Tender Specifications_9196_IT_Infrastructure [...]
|
ECDC has 5 systems with BIA level 4. There is no system at BIA level 5, as this level would mean no system [...]
|
01/02/2018
|
|
14
|
With reference to “2.2.7.3 Standby service” of the “EN-Tender Specifications_9196_IT_Infrastructure services [...]
|
As described under 2.2.7.3. in rare cases standby duty intervention is required (during 2016 in 20 cases [...]
|
01/02/2018
|
|
15
|
With reference to section “3.Interfaces, roles and responsibilities” of “EN-Technical Annex 4 Draft SLA [...]
|
1. You are free in the composition of your proposed team, but commonly one would expect that existing [...]
|
01/02/2018
|
|
16
|
With reference to section “2.2.4.2. ICT BackOffice” of the Tender Specifications, the area of management [...]
|
Incidents with Microsoft could be followed by either team, depending on the nature of the request, e.g [...]
|
01/02/2018
|
|
17
|
With reference to section “4.1. Technical Proposal” of the Tender Specifications, for each required document [...]
|
CVs can be annexed and are excluded from the page limits. Cover page, table on content etc are included [...]
|
01/02/2018
|
|
18
|
With reference to section “2.2.6.1 Off-site infrastructure requirements” of the “EN-Tender Specifications [...]
|
ECDC will provide the consultants with laptops and software that will allow them to work on the ECDC [...]
|
01/02/2018
|
|
19
|
With reference to section “3.2.3. Technical and Professional Capacity” of the Tender Specifications, [...]
|
Indeed 2.2.6 gives details on the minimum security requirements that should be described under 3.2.3
|
01/02/2018
|
|
20
|
With reference to Section “3. IT Service Manager” of the Technical Annex 3 – Consultancy Profiles, in [...]
|
Your understanding is correct. The ITIL expert certification is sufficient.
|
01/02/2018
|
|