41
Considering MT 59A and QGBT 59A single-line wiring diagrams, how should the contemporaneity of transformers [...]
Question is not clear, please clarify
18/05/2020
Ingħatat Tweġiba
40
Is it possible to have technical datasheets of the existing 2 MVA auxiliaries transformers and the 2 [...]
Datasheets are attached to the tender documents, the contractor can find technical data therein
18/05/2020
Ingħatat Tweġiba
39
It is stated that the SS14 substation electric panel will manage the island mode operation. Is it possible [...]
The schematics of the panel are added to the tender documents. The control logics for the electrical [...]
18/05/2020
Ingħatat Tweġiba
38
What is the “cosphi” value considered with reference to the 1500 kWe power output?
Rated power factor shall be 0,8 according to RE98005 §8.3.2.
18/05/2020
Ingħatat Tweġiba
37
With reference to the list of documents in "EN-05-Tender specifications_Part 2_Technical specifications [...]
il documento pertinente è stato caricato
15/05/2020
Ingħatat Tweġiba
36
We are kindly ask to confirm that with regard to the professional capacity requirements set out in criterion [...]
l'esperienza professionale maturata nel settore è già inserita tra i requisiti del punto T3. Tale esperienza [...]
15/05/2020
Ingħatat Tweġiba
35
Good morning, with reference to the above procedure, clarification is needed on the following points: [...]
Il criterio T2 stabilisce che ciascuno dei quattro profili professionali identificati si richiede qualificazione [...]
14/05/2020
Ingħatat Tweġiba
34
The plan shows N ° 2 tanks for the fresh lubricating oil of the engines of 3 cubic meters each. Confirmation [...]
Il disegno LY92003 (vedere figura in calce) mostra un serbatoio interrato per lo stoccaggio dell’olio [...]
13/05/2020
Ingħatat Tweġiba
33
Will the compressed air for the new system be made available by the existing system? If yes, please indicate [...]
Si richiede un nuovo sistema dedicato - vedi doc. RE9800, §4.2.1 – dove, tra le varie apparecchiature [...]
13/05/2020
Ingħatat Tweġiba
32
To cover the new building, two expansion tanks are indicated for the hot water and chilled water circuits [...]
Anche se mostrato solo negli elaborati grafici e non nei P&ID, il progetto preliminare prevede l’ [...]
13/05/2020
Ingħatat Tweġiba