6
|
The Technical Proposal must contain a proposal for a Service Level Agreement (SLA) based on Annex 4 ( [...]
|
A) Indeed there is a relationship in the desired service agreement and the technical offer, while there [...]
|
22/01/2018
|
|
1
|
1. The “Estimates for Work area 2 - ICT BackOffice” in tender specifications section 2.2.5.5 are summing [...]
|
1. The estimations in the work area Backoffice under 2.2.5.5. indeed add up to 101% due a rounding error [...]
|
22/01/2018
|
|
2
|
The technical annex 4 refer in the first page: […]In chapter 9 the mandatory Key performance indicators [...]
|
Indeed the reference should be to chapter 8 instead of chapter 9.
|
22/01/2018
|
|
3
|
Doc “Tender Specifications”, pg 28: Profiles required: “Server Administrator” but in “Technical Annex [...]
|
The profile name “Server administrator” and “System administrator” should be read as equivalent. In the [...]
|
22/01/2018
|
|
4
|
Will you provide a template for the proof of references to projects ?
|
ECDC will not provide a template. The contractor may choose himself a simple template.
|
22/01/2018
|
|
5
|
Do you confirm that the estimation of the annual workload in man-hours (for instance 90 for the frontoffice [...]
|
It is correct, the right column gives an indication of work hours outside office hours and outside the [...]
|
22/01/2018
|
|
7
|
Online the time limit says last day to hand in our offer is 16/02/2018 and in the material provided to [...]
|
The official deadline for submission of tenders is 28/02/2018, this will be corrected as soon as possible [...]
|
22/01/2018
|
|
8
|
Can you please give detailed information about the applications to host within this FwC, regarding data [...]
|
You find information about the hosting service provided by the Backoffice team under 2.2.4.2 in the tender [...]
|
25/01/2018
|
|
10
|
In the case of 18 penalty points (and higher) no other consequence than "Possible termination of FWC" [...]
|
It is correct, in the situation of 18 or more penalty points and that ECDC would not cancel the FWC, [...]
|
26/01/2018
|
|
9
|
The TS, page 13 Minimum Requirements, stipulates: "1. All contractor’s consultants working for ECDC need [...]
|
All contractors consultants working for ECDC need to have an ITIL foundation certification. This is applicable [...]
|
26/01/2018
|
|