Detalii licitaţie

Titlu:
Servicii locative/de găzduire pentru un centru de date destinat asigurării conti...
Autoritate contractantă:
European Maritime Safety Agency
Data de publicare pe TED:
06/04/2020
Termen pentru primirea ofertelor:
11/05/2020
Status:
Închisă
Afişare parametrii de filtrare

Results per page: 10 | 25 | 50 47 Întrebări found, displaying all Întrebări .
# Întrebare Răspuns Data ultimei publicări Status
47
33. Do EMSA BCF has access conditions to take the racks completed or need to be in parts (ex: weight [...]
The current EMSA BCF hosting site has the access conditions to move the complete racks.
05/05/2020
46
32. The move includes cables?
Yes all cables should be moved and re-installed to be re-used in the new hosting center.
05/05/2020
45
31. The move of the systems/equipment is just in one wave or EMSA need more than one wave to do the move [...]
The move shall be performed in as less time as possible in order to minimise the risk for EMSA of being [...]
05/05/2020
44
30. In any circumstances the move includes moving all the systems/equipment but not the rack?
Racks shall be moved together with the other equipment, and shall be re-installed to be re-used in the [...]
05/05/2020
43
29. The system/equipment in the origin site has all the cables (energy, networking, etc.) tagged or is [...]
It is part of the service to tag it.
05/05/2020
42
28. Is it possible to refer the validity of the contract of this systems/equipment and the entity that [...]
After the award of the contract, a kick off meeting will be held to review the plan for the move, and [...]
05/05/2020
41
27. It’s possible to have Serial Number of each system/equipment in scope?
After the award of the contract, a kick off meeting will be held to review the plan for the move, and [...]
05/05/2020
40
26. What is the scope of EMSA team in this process?
EMSA Team will assist at the beginning with the shutdown phase (remotely), and then it will assist again [...]
05/05/2020
39
25. It is possible to have remote access to the systems/equipment located in EMSA BCF through EMSA DC [...]
Yes – after the contract award.
05/05/2020
38
24. We assume that EMSA will guaranty data recovery mechanisms (backups) and have operational recovery [...]
Yes
05/05/2020
37
23. We assume that no contingency plan or equipment will be needed besides the insurance policy for the [...]
The plan for the move will be assessed based on how it handles possible risks for EMSA during the transportation [...]
05/05/2020
36
22. After the moving and physically install system/equipment in the new EMSA BCF they will be power on [...]
Yes data re-syncronisation, functional and application tests will be executed by EMSA Team.
05/05/2020
35
21. All IP addressing will be the same in the EMSA BCF data center? There’s no need for system/equipment [...]
Yes – addressing will stay the same, hence no need for reconfiguration.
05/05/2020
34
20. No new equipment will be added in new EMSA BCF data center?
No new equipment will be added previously and during the move.
05/05/2020
33
19. Each system/ equipment will maintain its original rack position?
Yes
05/05/2020
32
18. Should we presume that the move will occur in single phase?
Yes
05/05/2020
31
17. All system/ equipment in EMSA BCF datacentre are independent and maybe shutdown?
Yes
05/05/2020
30
Thus, under the terms and for the purposes of the provisions of article 21º of the DIRECTIVE 2014/24/ [...]
Please refer to answer provided to part I.
05/05/2020
29
In this regard, the Law No. 26/2016 of August 22, expressly states that “A third party only has the right [...]
Please refer to answer provided to part I.
05/05/2020
28
Paragraph 1 of article 66 of the CCP refers that “for reasons of commercial, industrial, military or [...]
Please refer to answer provided to part I.
05/05/2020
27
The article 21º of the DIRECTIVE 2014/24/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 February [...]
Please refer to answer provided to part I.
05/05/2020
26
MEO – SERVIÇOS DE COMUNICAÇÕES E MULTIMÉDIA, S.A., hereinafter also referred to as “MEO”, a public limited [...]
"As a general obligation stemming from the Treaty on the Functioning of the European Union and the Charter [...]
05/05/2020
25
The line to connect EMSA BCF and EMSA DC, could be a L3 line (IP or MPLS) or is required to be a L2 connection [...]
Line can be L3.
05/05/2020
24
On the Internet Connectivity - when filling the 5Gbps solution, the price should be the total amount [...]
Price shall be the total amount for the 5Gbps solution. Please note that all prices in the table are [...]
05/05/2020
23
Can all documents, that are to be uploaded by the tenderer, be digitally signed? including the ones where [...]
"According to Section 3 of Appendix I e-Submission Guidelines attached to the Tender Specifications, [...]
05/05/2020
22
The FWC, on I.3.3, states that "The FWC is concluded for a period of 48 months", and on I.3.5 that "The [...]
Power upgrades and downgrades shall be considered on a yearly basis (i.e., annual contract anniversary [...]
05/05/2020
21
The FWC, on I.3.3, states that "The FWC is concluded for a period of 48 months", and on I.3.5 that "The [...]
"Downgrades of physical space can be requested at each annual contract anniversary. The reference to [...]
05/05/2020
20
A package of remote hands hours is to be quoted. Is it possible to have a forecast of hours per year? [...]
Effective amount of hours consumed per month and per year can vary greatly depending on needs, and there [...]
05/05/2020
19
Which physical interfaces are to be considered for the Internet and Connectivity Layer 2? (i.e. 10G base-SR [...]
Connectors are specified in the Appendix A of the Tender Specifications attached to the Invitation to [...]
05/05/2020
18
Does the maximum budget available include all the posibles renewals?
Yes, as per Article I.5.1 (Maximum amount of the FWC and maximum prices) of the draft Framework Contract [...]
24/04/2020
17
16. On Appendix B (Price Calculation.xls) what’s the purpose of a pricing for a “4-racks configuration [...]
The purpose is to provide a price for “4-racks configuration” if needed during contract implementation [...]
22/04/2020
16
15. What type of structured cabling provided for each rack do you have in EMSA BCF (Madrid) – centralized [...]
Two racks contain network devices, and all the other racks have cables and fibres directly running from [...]
22/04/2020
15
14. The layout of racks (position of each equipment on rack) in EMSA BCF (Madrid) shall be maintained [...]
Yes
22/04/2020
14
13. How many Cat.6 1000Base-T cables with RJ-45 or FO Cables are needed for each rack?
Tenderer shall only provide Internet cables (RJ45 and FO) as specified in the Tender Specifications ( [...]
22/04/2020
13
12. With the use of 1 Eaton STS switch on DELL rack, how many equipment’s have only one input power supply [...]
Only one equipment connected to the Eaton STS switch on DELL rack has only one power supply.
22/04/2020
12
11. All the provided rack power is single-phase (for all racks)?
Yes
22/04/2020
11
10. There’s no detail provided on this quote (pp. 17) – “Symantec NetBackup 52201x SUN rack with the [...]
It is a typo – please disregard the following words under that sentence: “SUN rack with the following [...]
22/04/2020
10
9. What requirements are requested to access control for the cage?
Tenderer shall propose its control measures available for accessing the datacentre and the cage.
22/04/2020
9
8. Does CCTV monitoring the cage will be provided by EMSA, regarding this quote on Specification Document [...]
Yes – the Tenderer shall confirm that it is possible for EMSA to activate its own camera monitoring system [...]
22/04/2020
8
7. How many racks shall be provided by us on our Datacentre to EMSA equipment’s (excluding EXADATA and [...]
EMSA has its own racks, and doesn’t need any rack provided by the Tenderer. EMSA own racks shall be moved [...]
22/04/2020
7
6. Does TESTA rack requires any specialized professional services?
As explained in the Tender Specifications (section 2.1, page 6), TESTA rack might have to be moved without [...]
22/04/2020
6
5. The Oracle Exadata X5-2, Netapp storage array and “TESTA” rack shall be moved on different and segregated [...]
Not necessarily.
22/04/2020
5
4. All rack equipment’s (except Oracle Exadata and Netapp array) have active support contracts that cover [...]
Equipment has active support contracts, which however does not cover for damages provoked by a move – [...]
22/04/2020
4
3. What’s the maximum time that EMSA BCF (Madrid) systems could remain shutdown to perform the move?
EMSA BCF systems should not stay in shutdown for more than 10 calendar days. The longer the shutdown [...]
22/04/2020
3
2. Some weeks preceding the move, all applications that use EMSA BCF (Madrid) as the main site will be [...]
Yes, site will be emptied of its applications by EMSA Team before the move will start.
22/04/2020
2
1. Regarding the Datacentre move, EMSA shall perform a list of tests to qualify that the reboot on the [...]
Yes, reboot tests are requested as part of the all-inclusive move. EMSA Personnel might assist in this [...]
22/04/2020
1
Due to COVID-19 and measures taken by EU states' governments, we are applying a work-from-home approach [...]
The services to be procured under this procedure are needed to replace as soon as possible the services [...]
21/04/2020