1
Due to COVID-19 and measures taken by EU states' governments, we are applying a work-from-home approach [...]
The services to be procured under this procedure are needed to replace as soon as possible the services [...]
21/04/2020
10
9. What requirements are requested to access control for the cage?
Tenderer shall propose its control measures available for accessing the datacentre and the cage.
22/04/2020
11
10. There’s no detail provided on this quote (pp. 17) – “Symantec NetBackup 52201x SUN rack with the [...]
It is a typo – please disregard the following words under that sentence: “SUN rack with the following [...]
22/04/2020
12
11. All the provided rack power is single-phase (for all racks)?
Yes
22/04/2020
13
12. With the use of 1 Eaton STS switch on DELL rack, how many equipment’s have only one input power supply [...]
Only one equipment connected to the Eaton STS switch on DELL rack has only one power supply.
22/04/2020
14
13. How many Cat.6 1000Base-T cables with RJ-45 or FO Cables are needed for each rack?
Tenderer shall only provide Internet cables (RJ45 and FO) as specified in the Tender Specifications ( [...]
22/04/2020
15
14. The layout of racks (position of each equipment on rack) in EMSA BCF (Madrid) shall be maintained [...]
Yes
22/04/2020
16
15. What type of structured cabling provided for each rack do you have in EMSA BCF (Madrid) – centralized [...]
Two racks contain network devices, and all the other racks have cables and fibres directly running from [...]
22/04/2020
17
16. On Appendix B (Price Calculation.xls) what’s the purpose of a pricing for a “4-racks configuration [...]
The purpose is to provide a price for “4-racks configuration” if needed during contract implementation [...]
22/04/2020
2
1. Regarding the Datacentre move, EMSA shall perform a list of tests to qualify that the reboot on the [...]
Yes, reboot tests are requested as part of the all-inclusive move. EMSA Personnel might assist in this [...]
22/04/2020