13
|
With reference to section “2.2.7.5 Service level definitions” of the “EN-Tender Specifications_9196_IT_Infrastructure [...]
|
ECDC has 5 systems with BIA level 4. There is no system at BIA level 5, as this level would mean no system [...]
|
01/02/2018
|
|
21
|
With reference to section “8.List of Key Performance Indicators” of “EN-Technical Annex 4 Draft SLA” [...]
|
You are right that the reference is wrong, as the list of contract managers is now in the document “EN-Technical [...]
|
01/02/2018
|
|
15
|
With reference to section “3.Interfaces, roles and responsibilities” of “EN-Technical Annex 4 Draft SLA [...]
|
1. You are free in the composition of your proposed team, but commonly one would expect that existing [...]
|
01/02/2018
|
|
27
|
The Tenderer is required to provide a document presenting the tenderer’s proposal for a Service Level [...]
|
Indeed chapter 1,2,4,5,6,7 of the draft SLA should be used without ANY modification. Indeed Chapter 3 [...]
|
05/02/2018
|
|
19
|
With reference to section “3.2.3. Technical and Professional Capacity” of the Tender Specifications, [...]
|
Indeed 2.2.6 gives details on the minimum security requirements that should be described under 3.2.3
|
01/02/2018
|
|
16
|
With reference to section “2.2.4.2. ICT BackOffice” of the Tender Specifications, the area of management [...]
|
Incidents with Microsoft could be followed by either team, depending on the nature of the request, e.g [...]
|
01/02/2018
|
|
18
|
With reference to section “2.2.6.1 Off-site infrastructure requirements” of the “EN-Tender Specifications [...]
|
ECDC will provide the consultants with laptops and software that will allow them to work on the ECDC [...]
|
01/02/2018
|
|
17
|
With reference to section “4.1. Technical Proposal” of the Tender Specifications, for each required document [...]
|
CVs can be annexed and are excluded from the page limits. Cover page, table on content etc are included [...]
|
01/02/2018
|
|
28
|
There is a limit of 3 pages for the description of the tenderer's activity. In the case of a consortium [...]
|
The limit of 3 pages should be applied regardless if single economic operator or consortium.
|
05/02/2018
|
|
29
|
There is a limit of 3 pages for the description of the roadmap for the implementation of the security [...]
|
The page limit of 3 pages should be applied regardless if you have a single or multiple off-side locations [...]
|
05/02/2018
|
|