Uppgifter om anbudsinfordringar

Rubrik:
Multipelt ramavtal i kaskadform för programvaruutveckling och IT-tjänster
Upphandlande myndighet:
European Fisheries Control Agency (EFCA)
Publiceringsdatum i TED:
05/04/2019
Sista anbudsdag:
13/05/2019
Status:
Stängd
Visa filterparametrar

Results per page: 10 | 25 | 50 25 Frågor found, displaying all Frågor .
# Fråga Svar Senaste publiceringsdag: Status
25
The Article I.15.4 Replacement of the contractor’s personnel applicable to Times and means and Quoted [...]
As per Article I.15.4 a replacement must be available at least 10 working days before the effective termination [...]
02/05/2019
24
Dear Sir, Madam, could you, please, clarify: 1. In case of a Consortium, all the members have to provide [...]
1. All members of the consortium 2. The requirement is that the tenderer must have a professional risk [...]
25/04/2019
23
One of the questions to be addressed under award sub-criteria 2.b is 'Processes and subject matter consultants [...]
It means the human resources that the tenderer would dedicate to Service management for achieving an [...]
25/04/2019
22
If, due to logistical reasons, we are unable to provide all of the subcontractors signatures on one single [...]
Yes.
25/04/2019
21
In accordance with article II.4.9 or any other need for replacement to ensure service continuity, a replacement [...]
Please, see the procedure for the reduction in price in Article II.16.2 of the draft framework contract [...]
25/04/2019
20
We understand that non-planned absences or absences due to force majeure with a limited duration are [...]
The term disruption in Article II.4.9 does not refer to disruption of the service due to a temporary [...]
25/04/2019
19
The Article I.15.4 of the Framework Contract states the following: ““In case of EFCA’s request in accordance [...]
Article I.15.4 applies in case of leaving contractor's personnel and in case of EFCA's request under [...]
25/04/2019
18
The Technical Specifications, page 13, specify that the contractor should nominate a Contract Manager [...]
The service manager in annex I is a role as described in ITIL and not about managing the Framework contract [...]
24/04/2019
17
This question relates to Service Quality Indicator DP-2 (Ratio of satisfactorily performed specific contracts [...]
Quality indicator DP-2 is obtained by both quantitative and qualitative data following each specific [...]
24/04/2019
16
According to the Article II.16 or the Framework Contract, in case of non-compliance of quality indicator [...]
See Article. II.16.1 Quality standards. EFCA may reduce or recover payments proportionally to the seriousness [...]
24/04/2019
15
Hello, could you please confirm that the quality evaluation will be assessed only based on the information [...]
The quality evaluation will be based on the quality of tenderer's technical tender which must include [...]
24/04/2019
14
According to tender specifications, in section C.2.2 Professional and technical capacity, part d), tenderers [...]
See answer 13.
24/04/2019
13
According to tender specifications, in section C.2.2 Professional and technical capacity, part d), tenderers [...]
They can be any from S3, S4, S6, S7, S8, S9 as in Annex H.
24/04/2019
12
Dear Sir, Madam, Please clarify : 1. Where we find the requests for profiles (CV)? 2. For each technology [...]
1. Profiles are listed in Annex I. CV s are not to be submitted at the tender submission stage. 2. The [...]
24/04/2019
11
In Annex I, Profiles - Profile Overview, it is stated “For the provision of the services, Contractor’ [...]
Yes, as stated in Annex I the contractor shall have the capacity to provide all profiles. During the [...]
23/04/2019
10
It is clear that the 4 references will be submitted by the sucessful tenderer. Could the client inform [...]
See tender specifications section C.2. Selection criteria p.16 : At the tendering stage it is sufficient [...]
23/04/2019
9
Dear Sir, Madam, We would be grateful if you would clarify the following queries: 1. Please confirm that [...]
1. Confirmed 2. They are separate documents 3. Not needed at the tendering stage 4. See in e-Submission [...]
16/04/2019
8
In the Tender Specifications, section 2. Background, the list of operational systems includes EIR and [...]
See disclaimer on p. 3 of Annex L: The information contained in Annex L reflects the situation in force [...]
16/04/2019
7
"Sample deliverables (Gantt charts, roadmap, screenshots, mock-ups etc) containing multiple A4 pages [...]
See Introduction in the Annex O. Additional content are not bound by the 10-page rule but their size [...]
16/04/2019
6
In the section “Context” of the Case Study 2, is established that the tenderer must propose a new architecture [...]
This theoretical context must be reflected in the tenderers answers as a whole.
16/04/2019
5
Annex I states, in page 4, "The profiles and levels of expertise shall be the basis for the FWC price [...]
The tenderer has to provide prices for all profiles as listed in Annex B.
16/04/2019
4
We understand that the practice to be described under this sub-criteria should not only include the methodology [...]
Yes, the internal practise to establish a complete offer for a fixed price project.
15/04/2019
3
“Sample deliverables (Gantt charts, roadmap, screenshots, mock-ups etc) containing multiple A4 pages [...]
See Annex P Introduction: The size of document to be used in the offer can be extended from 1 to maximum [...]
15/04/2019
2
"Sample deliverables (Gantt charts, roadmap, screenshots, mock-ups etc) containing multiple A4 pages [...]
See Annex O Introduction: The length of the reply to each Case Study should not go beyond ten (10) A4 [...]
15/04/2019
1
Dear Sir, Madam, With reference to the documents provided in the Library, it appears that neither Annex [...]
There are no Annex G nor N.
09/04/2019