Uppgifter om anbudsinfordringar

Rubrik:
Crowdsourcing: att effektivt engagera samhällen inom riskbedömning av livsmedel ...
Upphandlande myndighet:
European Food Safety Authority (EFSA)
Publiceringsdatum i TED:
21/10/2015
Sista anbudsdag:
15/01/2016
Status:
Stängd
Tidsfristen för att ladda ner handlingar avseende denna anbudsinfordran har gått ut. Nerladdning av handlingar är inte möjlig Tidsfristen för att ladda ner handlingar avseende denna anbudsinfordran har gått ut. Nerladdning av handlingar är inte möjlig
Visa filterparametrar

Results per page: 10 | 25 | 50 9 Frågor found, displaying all Frågor .
# Fråga Svar Senaste publiceringsdag: Status
5
In relation to 2f: What do "different project types" relate to?
In point 2b the contractor is requested to identify communities and engagement approaches for each relevant[...]
26/11/2015
4
Should the pilot system cover all kinds of theoretically possible types or only the two chosen for the[...]
The pilot test phase should cover two among the three proposed pilot studies (3a, 3b, 3c).
26/11/2015
3
Regarding Objective 2g), can an overview of EFSA information architecture be made available?
Please find enclosed our catalogue of business identities and the matrix of the business entities and[...]
26/11/2015
2
The specifications 2g) will be heavily influenced by EFSA's information architecture, and it is challenging[...]
Point 2g) of the feasibility study should identify the information technology needs for each of the crowdsourcing[...]
26/11/2015
1
In addition, could the requirements Regarding Objective 3, will EFSA specify the topics to be addressed[...]
The topic to be addressed in the two pilot studies will be discussed with EFSA. On the basis of the findings[...]
26/11/2015
8
Re. the draft contract clause 11.15.1 it is not clear if a Pre-Financing Guarantee and Performance Guarantee[...]
This is EFSA draft standard contract. No pre-financing guarantee or performance guarantee will be required[...]
07/01/2016
9
Dear Sir/Madam, you are requesting: "The tenderer must have generated an overall annual turnover of at[...]
Correction to the first sentence in the answer given above earlier today. The minimum requirement for[...]
08/01/2016
7
No points seem to be allocated to the methodology for the inventory. Is this correct or is the inventory[...]
The inventory is subsumed within the feasibility study.
07/01/2016
6
The pilot study award only mentions the score for the systematic review. Is the 50 points only for the[...]
The 50 points are only referred to the methodology of the systematic review pilot study. Only the methodology[...]
07/01/2016