40
|
Will there be a possibility to adjust the prices quoted in our tender afterwards based on the actual [...]
|
For items for which the exact volume (e.g. m2) is not yet known, the tenderers shall quote a price per [...]
|
06/08/2019
|
|
76
|
Why do you ask for a different frequency of replacing the bins on the (MIVA) invalid tiolet?
|
The frequency of replacing the bins is based on the Agency’s previous experience. Frequency could be [...]
|
09/08/2019
|
|
37
|
Which type of coffee cups will you be using? PE-coated or a biodegradable cup with PLA-coating?
|
This information is not yet known. Coffee cups will be provided by the catering contractor. The procurement [...]
|
06/08/2019
|
|
11
|
When entering a subcontractor in E-tendering, the system requires a declaration of honour and other selection [...]
|
1. As indicated in section 4.2 of the technical specifications a completed and signed Annex III is required [...]
|
31/07/2019
|
|
92
|
What is the width of the access road to expedition/’Milieustraat’? Can you confirm that waste collector [...]
|
The size of the truck that can enter the expedition road and area is limited to the size as specified [...]
|
19/08/2019
|
|
43
|
What is the estimated date of the start of te contract (also in relation to the award date early november [...]
|
It is currently envisaged that the contract award decision will be communicated in mid-November19, and [...]
|
06/08/2019
|
|
55
|
We know from our own experience that the waste collection drawers that you intend to use are very small [...]
|
The Agency is unable to change the design of the collection drawers at this stage. As per the technical [...]
|
07/08/2019
|
|
66
|
We have noticed that floor 2 is missing from your overview. Can you please provide the details for this [...]
|
It is not clear to the Agency which overview is meant. Could the economic operator clarify this please [...]
|
07/08/2019
|
|
74
|
We do not find any soap at the sanitary consumables in the costing sheet. Can you indicate why you are [...]
|
Hand soap has been added to the Costing sheet in sheet 1 (Cleaning services) in section 2: Consumables [...]
|
09/08/2019
|
|
44
|
We can not find Annex XIX in the document library, can you provide us with that document?
|
A sample purchase order is included as the very last page of the draft Contract (Annex VII to the Technical [...]
|
06/08/2019
|
|