91
Regarding the Annex 5.2, it only mentions the case where the tenderer relies on another entity(ies) to [...]
Administrative specifications point 2.4.3 states: With regard to technical and professional selection [...]
12/06/2020
Megválaszolva
90
Client is kindly requested to clarify if the the photovoltaic panels into the South façade of the new [...]
The photovoltaic system is not included in the scope of the supply. The point of connection has not been [...]
12/06/2020
Megválaszolva
89
With reference to the interconnection of the new generators with existing distribution system, is it [...]
The QMT schemes have been published on May the 29th, (in reply to Q70). Further details shall be collected [...]
12/06/2020
Megválaszolva
88
Is it possible to know: 1) The total volume of ion exchange resins; 2) Demineralization type system ( [...]
The technical document describing the demineralisation system has been already published (question 43 [...]
12/06/2020
Megválaszolva
87
Please clarify if a local control station is required in the field for the monitoring, operate and control [...]
No field control station required except for motorized valves; operator items (selector switches, pushbuttons [...]
12/06/2020
Megválaszolva
86
Good morning, we would like to ask your authority to publish the tender documents also in Italian, for [...]
the Italian version of the documents will be published in the next few days
12/06/2020
Megválaszolva
85
We are a Spanish company. We are interested in the project but on 17/06/2020 we are still with problems [...]
Please check the announcement published
12/06/2020
Megválaszolva
84
Which HW signal will be exchange with RIO cabinet?
The old load shedding selector-relay panel shall be replaced by new DCS RIO panels. Existing panel can [...]
11/06/2020
Megválaszolva
83
Please clarify where is located this control room.
The location of the data centre where the OS can be installed has been clarified in an attachment published [...]
11/06/2020
Megválaszolva
82
We can reuse this RIO Panel or is requested new
To be replaced as per scope of the supply. Can be part of new Q-SYNC14.
11/06/2020
Megválaszolva