Pakkumiskutse andmed

Please note that in the eSubmission homepage (Tendering data) the valid tendering dates are those in the second blue banner: tender deadline 31/07/2020 16:00; Opening of tenders: 03/08/2020 11:00. The warning refers to the old date 11/06/2020. Tenders submitted within 31/07/2020 16:00 will be considered in time. IMPORTANT Published in Questions&Answers tab clarifications on issues with uploading p7m offer files.
Pealkiri:
JRC Ispra asutuse elektri-, soojus- ja jahutusenergia koostootmissüsteemi modern...
Tellija:
European Commission, Joint Research Centre - Ispra (JRC-IPR)
TEDis avaldamise kuupäev:
10/03/2020
Pakkumuste vastuvõtmise tähtaeg:
31/07/2020
Olek:
Suletud
Näita filtreerimisparameetreid

Results per page: 10 | 25 | 50 180 Küsimused found, displaying 111 to 120.[First/Prev] 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18 [Next/Last]
# Küsimus Vastus Viimati avaldatud: Olek
71
Tenderers have to upload the "Analytical bill of quantity and work estimate" according to document list [...]
The financial offer form, filled in by the tenderer, determines the value of the contract, invariable [...]
29/05/2020
70
Please provide the Single Line Diagrams of QMT-14 and QSYN14
Diagrams are attached
29/05/2020
69
With reference to civil works (excavation etc..) for the underground natural gas and cooling tower lines [...]
Excavation and civil works for underground natural gas and cooling tower lines are not included in the [...]
28/05/2020
68
Please clarify why the EDG is a battery limit. With the new cogeneration plant, the black starting will [...]
The existing EDG is currently a mobile installation to be manually connected to the black-start cogenerator [...]
28/05/2020
67
Please explain what you mean by Keypad security system control panel
A central panel from where the access security devices are configured / activated / reset etc.
28/05/2020
66
Panic / medical push buttons is intended as a single button in the control room or what else, please [...]
The manual call points should be reachable from any workplace areas therefore also especially where maintenance [...]
28/05/2020
65
We would like to understand if you require only external cameras or even internal cameras for surveillance [...]
A limited number of cameras should also monitor indoor areas
28/05/2020
64
In the Layout Annex 1 there are indicated Heat and Smoke Detectors. Please clarify.
Gas detectors + heat and smoke detectors shall be envisaged in generator rooms. Only heat and smoke detectors [...]
28/05/2020
63
We don't find the Fire Fighting layouts el.6200 and el.11200, so we deduce that we should not expect [...]
Fire risk evaluation and Fire Fighting design (at all building storeys) is in scope of Contract, all [...]
28/05/2020
62
we need a general layout where we can see the location of these systems,
Layouts are attached to tender documents
28/05/2020