Please note that in the eSubmission homepage (Tendering data) the valid tendering dates are those in the second blue banner: tender deadline 31/07/2020 16:00; Opening of tenders: 03/08/2020 11:00. The warning refers to the old date 11/06/2020. Tenders submitted within 31/07/2020 16:00 will be considered in time. IMPORTANT Published in Questions&Answers tab clarifications on issues with uploading p7m offer files.
Title:
Retrofit of the Trigeneration System in JRC Ispra Site by Construction of a New ...
Contracting authority:
European Commission, Joint Research Centre - Ispra (JRC-IPR)
TED publication date:
10/03/2020
Time limit for receipt of tenders:
31/07/2020
Status:
Closed
Show filter parameters

Results per page: 10 | 25 | 50 180 Questions found, displaying 131 to 140.[First/Prev] 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18 [Next/Last]
# Question Answer Last publication date Status
51
We ask to confirm that the extension of warranty is referred only to engines
As stated in the technical offer form, the extension of warranty has to be referred to the engine-generator [...]
22/05/2020
50
With reference to the clarification n. 5 published on May 4th, in the question the analysis of the reference [...]
The chemical composition of the natural gas feeding the plant is not determined by the Commission, but [...]
22/05/2020
49
Good morning, we ask you to confirm whether, with regard to the economic and financial requirements required [...]
The last financial statement shall be deemed to be the last financial statement approved by the closing [...]
22/05/2020
48
is it possible to have more information regarding the existing boilers, chillers, heat pumps etc? In [...]
Technical documents and operating records are added to the tender documents
22/05/2020
47
As part of Scope of Work (SOW) of the Bidder the Client is kindly requested to clarify if the HVAC System [...]
The bidder is not requested to include in the bid the HVAC of the climatised areas of the building
22/05/2020
46
Regarding the redundancy of controller CPUs, have they to work together and compare their computation [...]
Please find redundancy requirements for CPU and I/O boards as per RE96001 – see §3.2, §4.1, §4.4. I/O [...]
22/05/2020
45
Is it possible to avoid the installation of the 30 barg compressors in case of electric starting systems [...]
The 30 barg compressor has been considered in the optic of the preliminary design. However, Contractor [...]
18/05/2020
44
Section 2.3.8.1 of the document labeled as “EN-03 – Financial offer form” states that a service walkways [...]
The indicated documents have been used as reference for the development of the preliminary design. Concerning [...]
18/05/2020
43
Is it possible to have technical datasheets regarding the existing water treatment systems (softener, [...]
A filtering, chlorination and demineralisation system exists. A technical sheet of the demineralisation [...]
18/05/2020
42
Is it possible to have additional information about the TLR network? Is the hot / chilled water flow [...]
The water in the TLR network is glycol-free.
18/05/2020