11
|
Concerning point 15.4: what are the criteria adopted for assessing the financial capacity? What is the [...]
|
The basic method is the analysis of the tenderer’s annual accounts (or financial statements). The financial [...]
|
23/04/2018
|
|
12
|
Concerning Appendix 1 point 2.4.: How many SATCOM terminals have to be provided for each size (medium [...]
|
There is no minimum nor maximum number of terminals that must be offered per category. Offers will be [...]
|
23/04/2018
|
|
13
|
With reference to EN-03 Tender Specifications Appendix 1 Technical Specifications.pdf section 2.1.1, [...]
|
The latency requirement of 2s shall be maintained at least between the RPAS and the LGCS. The Agency [...]
|
23/04/2018
|
|
14
|
With reference to EN-03 Tender Specifications Appendix 1 Technical Specifications.pdf section 2.1.1, [...]
|
It is the Bidders choice to use the same SATCOM terminal for the primary and the secondary Command and [...]
|
23/04/2018
|
|
15
|
Is it possible to make an inspection on site for a better understanding of installation, configuration [...]
|
An on-site inspection is not available during the tender process. Note that the sites themselves are [...]
|
23/04/2018
|
|
16
|
With reference to EN-03 Tender Specifications Appendix 1 Technical Specifications.pdf section 2.1.1, [...]
|
Yes, the Command and Control link data rate applies to both the return and forward link. The data rate [...]
|
23/04/2018
|
|
17
|
With reference to EN-03 Tender Specifications Appendix 1 Technical Specifications.pdf section 2.5.1, [...]
|
The required throughput is symmetric 10Mbps as defined in point 2.5 of Appendix 1 Technical Specifications [...]
|
23/04/2018
|
|
18
|
Dear sir/madam, due to the complexity of this project, we kindly request the extension of the deadline [...]
|
EMSA understands the complexity of the tender and for that reason already foresaw a bid submission period [...]
|
23/04/2018
|
|
19
|
1. Do you already have aircrafts or UAVs in operation or should they will be offered here as well? 2. [...]
|
1. EMSA already has RPAS in operation as well as a new procurement for large size RPAS (EMSA/OP/1/2018 [...]
|
23/04/2018
|
|
20
|
§1.1.1: How many RPAS are or will be deployed at the same time at most? Could you please give us an estimation [...]
|
The RPAS services are offered by EMSA free of charge to EU Member States, Candidate Countries and EFTA [...]
|
30/04/2018
|
|