Id-Dettalji tas-Sejħa għall-Offerti

Please note that in the eSubmission homepage (Tendering data) the valid tendering dates are those in the second blue banner: tender deadline 31/07/2020 16:00; Opening of tenders: 03/08/2020 11:00. The warning refers to the old date 11/06/2020. Tenders submitted within 31/07/2020 16:00 will be considered in time. IMPORTANT Published in Questions&Answers tab clarifications on issues with uploading p7m offer files.
It-titlu:
Modifika Retroattiva tas-Sistema tat-Triġenerazzjoni fis-sit ta' JRC Ispra bil-K...
L-Awtorità li Qiegħda Toħroġ il-Kuntratt:
European Commission, Joint Research Centre - Ispra (JRC-IPR)
Id-data tal-pubblikazzjoni tat-TED:
10/03/2020
Limitu ta' żmien għall-wasla tal-offerti:
31/07/2020
L-istatus:
Magħluq
Uri l-Parametri tal-Iffiltrar

Results per page: 10 | 25 | 50 180 Mistoqsijiet found, displaying 71 to 80.[First/Prev] 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 [Next/Last]
# Mistoqsija It-tweġiba Data tal-aħħar pubblikazzjoni L-istatus
111
Have the intercionections works (chilled water, electrical interconnections, etc..) special conditions [...]
Contractor shall propose in his offer a “Business Continuity” plan taking into account the operation [...]
01/07/2020
110
With reference to the Paragraph in Subject, the recovery boiler shall be a water-tube type. According [...]
Contractor shall verify the solution proposed in the preliminary designed and in case propose adequate [...]
01/07/2020
109
Good morning, we kindly ask for the possibility to avoid the installation of the bridge cranes over the [...]
Bridge cranes have been considered in the framework of the preliminary design. The Contractor shall verify [...]
01/07/2020
108
In relation to the configuration of the operating structure of the cogeneration plant, it is not clear [...]
Please refer to section 3.1.1 of the Technical Specification – Scope Description – doc. n° P.013273.2004 [...]
01/07/2020
107
In the Scope of Work document and in the financial offer point 2.2.2 the cooling towers system must be [...]
Regarding the configuration to be considered in the scope of the supply, it is a system with cooling [...]
01/07/2020
106
Is the air supply system located inside the boiler area? The air temperature in this area is not right [...]
Supply air system has been preliminary located in the boiler hall. The contractor shall verify in the [...]
01/07/2020
105
Is there a existing water storage tank for the fire fighting system of the new building? If yes, where [...]
There is no water storage tank for the building. Ispra Site has a water network distributed from a central [...]
01/07/2020
104
We understand that three cooling tower are foreseen: two of them to be devoted to the new chillers plus [...]
We confirm the content of clarification 20, and point out that the H&M balances have been developed [...]
01/07/2020
103
We are kindly asking you to forward us the minutes of the site visit that took place on 17/6/2020
The document with the minutes of the site visit has been published
29/06/2020
102
With reference to paragraph 3.2.1 of Part 1 of the Tender Specification can the “SOA — Qualification [...]
The SOA (Società Organismo di Attestazione) document , if referred to the authorisation to erect plants [...]
26/06/2020