111
Have the intercionections works (chilled water, electrical interconnections, etc..) special conditions [...]
Contractor shall propose in his offer a “Business Continuity” plan taking into account the operation [...]
01/07/2020
Ingħatat Tweġiba
110
With reference to the Paragraph in Subject, the recovery boiler shall be a water-tube type. According [...]
Contractor shall verify the solution proposed in the preliminary designed and in case propose adequate [...]
01/07/2020
Ingħatat Tweġiba
109
Good morning, we kindly ask for the possibility to avoid the installation of the bridge cranes over the [...]
Bridge cranes have been considered in the framework of the preliminary design. The Contractor shall verify [...]
01/07/2020
Ingħatat Tweġiba
108
In relation to the configuration of the operating structure of the cogeneration plant, it is not clear [...]
Please refer to section 3.1.1 of the Technical Specification – Scope Description – doc. n° P.013273.2004 [...]
01/07/2020
Ingħatat Tweġiba
107
In the Scope of Work document and in the financial offer point 2.2.2 the cooling towers system must be [...]
Regarding the configuration to be considered in the scope of the supply, it is a system with cooling [...]
01/07/2020
Ingħatat Tweġiba
106
Is the air supply system located inside the boiler area? The air temperature in this area is not right [...]
Supply air system has been preliminary located in the boiler hall. The contractor shall verify in the [...]
01/07/2020
Ingħatat Tweġiba
105
Is there a existing water storage tank for the fire fighting system of the new building? If yes, where [...]
There is no water storage tank for the building. Ispra Site has a water network distributed from a central [...]
01/07/2020
Ingħatat Tweġiba
104
We understand that three cooling tower are foreseen: two of them to be devoted to the new chillers plus [...]
We confirm the content of clarification 20, and point out that the H&M balances have been developed [...]
01/07/2020
Ingħatat Tweġiba
103
We are kindly asking you to forward us the minutes of the site visit that took place on 17/6/2020
The document with the minutes of the site visit has been published
29/06/2020
Ingħatat Tweġiba
102
With reference to paragraph 3.2.1 of Part 1 of the Tender Specification can the “SOA — Qualification [...]
The SOA (Società Organismo di Attestazione) document , if referred to the authorisation to erect plants [...]
26/06/2020