Informações relativas ao concurso

Título:
Serviços de infraestruturas informáticas
Entidade adjudicante:
European Centre for Disease Prevention and Control (ECDC)
Data de publicação na TED:
20/12/2017
Prazo para a receção de propostas:
28/02/2018
Estado:
Encerrado
Mostrar parâmetros do filtro

Results per page: 10 | 25 | 50 75 Questões found, displaying 1 to 10.[First/Prev] 1, 2, 3, 4, 5, 6, 7, 8 [Next/Last]
# Questão Resposta Data da última publicação Estado
14
With reference to “2.2.7.3 Standby service” of the “EN-Tender Specifications_9196_IT_Infrastructure services [...]
As described under 2.2.7.3. in rare cases standby duty intervention is required (during 2016 in 20 cases [...]
01/02/2018
23
With reference to “2.2.7.3 Standby service” of the “EN-Tender Specifications_9196_IT_Infrastructure services [...]
The standby duty service is always performed in full calendar weeks. As mentioned under 2.2.7.1 ECDC [...]
01/02/2018
65
With reference to Tender Specifications section 2.2.8.1 “Takeover phase of the existing services”, in [...]
Your assumption is correct that indeed this refers to the same takeover report and the second deadline [...]
15/02/2018
22
With reference to Technical Annex 3 – Consultancy Profiles, there are descriptions for the profiles of [...]
Indeed your understanding is correct and Front Office System Administrator is equal to FrontOffice administrator [...]
01/02/2018
21
With reference to section “8.List of Key Performance Indicators” of “EN-Technical Annex 4 Draft SLA” [...]
You are right that the reference is wrong, as the list of contract managers is now in the document “EN-Technical [...]
01/02/2018
74
With reference to section “4.2 Technical evaluation” of the Tender Specifications, the tenderer's proposal [...]
Your understanding is correct that the tenderer's proposal for a handover “appropriateness of the working [...]
22/02/2018
17
With reference to section “4.1. Technical Proposal” of the Tender Specifications, for each required document [...]
CVs can be annexed and are excluded from the page limits. Cover page, table on content etc are included [...]
01/02/2018
15
With reference to section “3.Interfaces, roles and responsibilities” of “EN-Technical Annex 4 Draft SLA [...]
1. You are free in the composition of your proposed team, but commonly one would expect that existing [...]
01/02/2018
35
With reference to section “3.2.3. Technical and Professional Capacity” of the Tender Specifications, [...]
The tenderer should submit the most relevant 3 references only.
05/02/2018
31
With reference to section “3.2.3. Technical and Professional Capacity” of the Tender Specifications, [...]
The limit of 3 pages should be applied regardless if single economic operator or consortium.
05/02/2018