# Otázka Odpoveď Dátum posledného uverejnenia Stav
70
“Is there any infrastructure for remote connection to the systems already in place in the EEAS (VPN, [...]
For Proximity and Near shore services, remote connection to the EEAS environment may be necessary. The [...]
25/10/2019
42
You state in terms of Contractor's entities the following:(Account Manager, Contract Manager, Service [...]
Indeed, in Technical specifications, point 7.2. Steering Committee meetings, it is mentioned "The Steering [...]
17/10/2019
31
You mention that "KPI-1: Failure to provide a suitable proposal activates the payment of a compensation [...]
KPI-1 applies also where there is no answer to the request. The different cases of failure to make a [...]
14/10/2019
47
Would you accept a declaration from the auditor, since the national law does not provide for the obligation [...]
Please note that the client's reference letters requested under point 5.3.3. a) of the tender specifications [...]
18/10/2019
11
With reference to “List of previous contracts“ table of Request to participate form, the “main registration [...]
We confirm your understanding. The main registration number of the economic operator who signed the contract [...]
01/10/2019
33
With reference to the documents which need to be provided in case of subcontracting, our understanding [...]
a) Yes, we confirm your understanding. As indicated in the tender specifications point 4, "Tenderers [...]
15/10/2019
69
With reference to the declaration on Honour, our understanding is that in case of a consortium all entities [...]
In case of the joint tender the selection criteria (economic and financial capacity, technical and professional [...]
25/10/2019
12
With reference to Section 5.3.3 Technical and professional capacity criteria and evidence of tender specifications [...]
By indicating "past three calendar years" we mean the past three calendar years for which accounts have [...]
01/10/2019
54
While we appreciate that EEAS have declined all requests for extension so far. However, in reason of [...]
The Contracting Authority has decided to postpone the time limit for receipt of tenders to 4th November [...]
21/10/2019
20
Where is Annex 11?
Please find Annex 11 to technical specifications in the technical specifications document page 64.
09/10/2019
49
When requesting to specify the structure of QTM proposals, do you mean to provide a template or something [...]
Structure refers here to a general description or plan showing the essential features of your answer. [...]
21/10/2019
16
We would like to request more time in order to engineer the best possible service for EEAS. Could you [...]
Please note that we do not consider extending the deadline. The deadline for the submission of tenders [...]
04/10/2019
2
We understand that the Technical proposal shall not exceed 80 pages in length (including annexes). The [...]
We expect examples illustrating tenderers' answers. Those examples do not need to be complete documents [...]
25/09/2019
1
We understand that the Technical proposal includes Annexes 2, 3, 4, 5, and 6. Could you please clarify [...]
a) Information submitted under Annex 2 shall be evaluated overall, is not attributed to any particular [...]
23/09/2019
26
We understand that the aim of the requested examples in this question is to illustrate the structure [...]
Your understanding is correct. Nevertheless, it is up to the tenderer to decide on the type of information [...]
11/10/2019
22
We need some clarifications regarding a profile: Will the Technical Team Leaders (TTL) be of the Project [...]
As indicated in 2.7. Technical Teams and Project teams of the Technical Specifications "One of the profiles [...]
11/10/2019
21
We need some clarifications regarding a profile: Portfolio Manager (POM) - Can you please confirm that [...]
Portfolio Manager (POM) will manage the portfolio of all EEAS projects related to the EEAS Information [...]
11/10/2019
58
We fully understand the application of the LDU’s, and this thanks to description given by EEAS in the [...]
After careful review of your request, the Contracting Authority considers that that the proposed model [...]
21/10/2019
43
Since we need to respect the 80 pages limitation, is it possible to put in annex all graphs and images [...]
All graphs, images (including organigrammes) will be counted within the 80-page limit.
17/10/2019
46
Since customers in the public sector in some EU Countries tend not to sign statements, could it be acceptable [...]
As indicated in tender specifications point 5.3.3 a) "For each contract in the table (list), the tenderer [...]
17/10/2019
64
Regarding the answer to question #12, if fiscal closing is December 31th, does “the past three calendar [...]
Yes.
22/10/2019
39
Procurement documents state: "The Contractor shall propose per requested profile at least 2 and maximum [...]
As stated in 4.2.1 Request, "QTM requests contain a Technical Annex detailing the different tasks to [...]
17/10/2019
55
Please consider extending the deadline for submission of Tenders for at least 2 weeks in order to allow [...]
The Contracting Authority has decided to postpone the time limit for receipt of tenders to 4th November [...]
21/10/2019
41
Our understanding is that we can submit answer to the 4 blocks of the technical questions in separate [...]
We do not confirm your understanding. As stated in 14. Annex 2 – Technical tender, “The tenderer will [...]
17/10/2019
6
Our understanding is that there are no CVs to be submitted at tender submission deadline (28/10/2019) [...]
We confirm there are no CVs to be submitted at tender submission deadline (28/10/2019).
26/09/2019
59
Our understanding is that the original hardcopies of the signed Tender Report and the Declaration on [...]
When the declaration(s) on honour and/or the tender report are signed by hand, a scanned copy must be [...]
21/10/2019
3
Our understanding is that the financial identification form must be submitted by the leader of the consortium [...]
Yes, your understanding is correct.
25/09/2019
44
Our understanding is that the cover, table of contents and question description are not counted in the [...]
The cover and table of contents are not counted in the limit of 80 pages.
17/10/2019
60
Our understanding is that in case of a joint offer with envisaged subcontracting, the “Legal Entity Form [...]
A legally constituted consortium must present its own Legal Entity Form (LEF) which is different from [...]
21/10/2019
17
On Question 3.5 Annex 5 of the technical specifications, can you please confirm our understanding that [...]
The award sub-criterion 3.5 requests to “specify which measures, tools and processes you commit to implement [...]
08/10/2019
34
It is our understading that the description of the tender is not included in the page limit of 80 pages [...]
The description of the tender will be counted within the 80-page limit. Regarding the 80-page limit, [...]
17/10/2019
15
Is the understanding that FWC will be awarded to a single economic operator and that it does not imply [...]
Indeed, the understanding is correct. The framework contract will be awarded to a single economic operator [...]
03/10/2019
35
Is the EEAS expecting a full Service Management Quality Plan (SMQP) in this answer? Or is the EEAS only [...]
The description of your proposal of SMQP does not need to be long, but should provide enough information [...]
17/10/2019
73
In your answer to question 19, you ask Tenderers to take into account in their prices all costs associated [...]
We confirm the answer to question 19. As stated in the Tender Specifications (in point 6.3 Financial [...]
30/10/2019
8
In the Tender Specifications, Section 5, Criterion 5.3.3.a), Minimum capacity level, p. 8, we read “Each [...]
We confirm that your understanding is correct.
26/09/2019
7
In the Tender Specifications, Section 5, Criterion 5.3.3.a), Minimum capacity level, p. 8, we read “At [...]
We confirm that all the mentioned examples are considered acceptable.
26/09/2019
67
In the quality award criteria you request for our approach for the first specific contracts of the first [...]
The Contracting Authority will decide on and request the services at the start of the framework contract [...]
22/10/2019
36
In the invitation to tender we read: The hand-signed originals (Tender report and Declaration on Honour [...]
Yes, we confirm that the hand-signed originals must be sent to the European External Action Service, [...]
17/10/2019
37
In the e-Submission platform, in the Tender offer step, the following fields are mandatory: Total amount [...]
As indicated in the e-Submission Quick guide in tender specifications point 3, you must fill in the total [...]
17/10/2019
63
In the document Request to participate form, section 6 Technical and professional capacity, table list [...]
Please note that if the currency of your contracts is EUR and you have filled in the column "value in [...]
22/10/2019
14
In the document Request to participate form, page 4, list of previous contracts, value in the currency [...]
The tenderers have to include the contract value during the past three calendar years (for which accounts [...]
01/10/2019
13
In the document Request to participate form, page 4, list of previous contracts, Our understanding is [...]
Yes, your understanding is correct.
01/10/2019
40
In technical tender award sub-criterion 2.1 you mention "processes, interfaces, responsibilities, structure [...]
Processes is a generic term referring here to the manner in which the work/activities/information/knowledge [...]
17/10/2019
50
In relation to the page limitation - 80 pages, is it allowed to have some graphs in the 80 pages at reduced [...]
All graphs will be counted within the 80-page limit. However, we accept that some graphs at reduced size [...]
21/10/2019
61
In regards to evidence in economic and financial capacity, we understand that entities relied upon will [...]
Your understanding is correct.
21/10/2019
45
In reference to Q&A 2, can you please confirm that the illustrative example of Q.3.2 can also be [...]
We expect practical examples illustrating tenderers' answer. These examples do not need to be complete [...]
17/10/2019
18
In Question 3.4 Annex 5 of technical specifications, can you please confirm our understanding that the [...]
Award sub-criterion 3.4 refers to both types of Services: Time and Means and Quoted Time and Means.
08/10/2019
19
In Question 3.3 Annex 5 of technical specifications it is requested to specify the necessary technical [...]
The award sub-criterion 3.3 requests to specify “How you will ensure that the technical infrastructure [...]
08/10/2019
30
In Question 19 you state that 'prices tendered for shall include all the costs to be incurred by the [...]
(a) Technical infrastructure means hardware and software needed for developments in Proximity and Near [...]
14/10/2019
72
In Q&A #28 EEAS is referring to 5.2.” All staff proposed by the contractor must be eligible to obtain [...]
We confirm that, as stated in “Technical Specification, point 5.2 Security Clearance”, “All staff proposed [...]
28/10/2019