# Otázka Odpověď Datum posledního zveřejnění Stav
19
1. Do you already have aircrafts or UAVs in operation or should they will be offered here as well? 2. [...]
1. EMSA already has RPAS in operation as well as a new procurement for large size RPAS (EMSA/OP/1/2018 [...]
23/04/2018
10
a) Will EMSA please verify the SATCOM equipment the vendors propose for Lot 1, (2 Mbps data rate) is [...]
a) In principle both lots are intended for fixed wing RPAS. The Agency's current platforms are medium [...]
20/04/2018
41
Answer to the question 25: “The Satellite Service Provider shall assess which security requirements are [...]
There are no security requirements on teleport location or accreditation because the information to be [...]
08/05/2018
8
Are there alreary routers, and of which type, aboard the current fleet of RPAS ? Will it be the responsibility [...]
The Agency operates with different RPAS platforms, most of them already have routers on-board to distribute [...]
20/04/2018
27
Are we correct in understanding that we do not need to provide any evidence regarding the exclusion criteria [...]
With regard to Exclusion criteria the tenderers do not need to upload any documentary evidence for exclusion [...]
30/04/2018
9
As some French overseas territories are included in the EU territory according to international treaties [...]
As per Tender Specifications: 1.1.8 and Appendix 1: 2.1: Areas of operation can be all sea areas surrounding [...]
20/04/2018
5
Can the same company be subcontractor in more than one tender to the FWC?
Please refer to point 10 of the Tender Specifications - economic operators on the market are free to [...]
20/04/2018
7
Can you confirm: - The method used to evaluate the link availability (exclusions, periods of time to [...]
-The Bidders can select the method that they consider more suitable to evaluate the link availability [...]
20/04/2018
12
Concerning Appendix 1 point 2.4.: How many SATCOM terminals have to be provided for each size (medium [...]
There is no minimum nor maximum number of terminals that must be offered per category. Offers will be [...]
23/04/2018
11
Concerning point 15.4: what are the criteria adopted for assessing the financial capacity? What is the [...]
The basic method is the analysis of the tenderer’s annual accounts (or financial statements). The financial [...]
23/04/2018
35
could you please clarify if the on-ground compliance tests will be paid to the Bidder, and shall be therefore [...]
The on-ground compliance test shall take place following the dispatch of the contract award letter and [...]
07/05/2018
2
Dear Sir/Madam, Can we request an area of operation that the RPAS will require to have BLOS communications [...]
The areas of operation can be all sea areas surrounding the European Union with an EU or EFTA country [...]
11/04/2018
1
Dear Sir/Madam, With regard tot he terminals that will need to go onto the 2 different types of RPAS. [...]
1. The details of the first type of RPAS are: TAKE-OFF WEIGHT / MASS UP TO 150 KG (MAXIMUM) ENDURANCE [...]
11/04/2018
18
Dear sir/madam, due to the complexity of this project, we kindly request the extension of the deadline [...]
EMSA understands the complexity of the tender and for that reason already foresaw a bid submission period [...]
23/04/2018
26
Due to the current social context in France, some key suppliers are impacted by the ongoing strikes. [...]
EMSA understands the complexity of the tender and for that reason already foresaw a bid submission period [...]
30/04/2018
39
During the set-up phase, the SATCOM capacity provision must be made available to the RPAS Services Providers [...]
The minimum of 100 flight hours is an estimation in order to guarantee the readiness of the system, not [...]
08/05/2018
33
For Lot 1 and Lot 2, shall the VSAT terminal be part of the scope of our service (terminal leasing) or [...]
Lot 1 and Lot 2 are intended for SATCOM services provision for RPAS; a Specific Contract (SC) for these [...]
07/05/2018
32
For Lot 1 and Lot 2, the Tender Specifications requires the contractor to provide a price per-unit rate [...]
In Appendix 3 Financial Tender Template for Lot 1 and Lot 2 there is no minimum commitment for data volumen [...]
07/05/2018
29
In I.6.1 is is stated "the contractor is responsible to determine and ensure that the correct methodology [...]
The provision of SATCOM services is an eligible supply of telecommunications, broadcasting and electronic [...]
07/05/2018
31
In Lot 3, for the installation of the VSAT terminal in land sites, we would require a clarification regarding [...]
The VSAT terminal antenna in-land will be installed at the aerodrome or airport hosting the LGCS. Prior [...]
07/05/2018
30
In Lot 3, Tender Specifications requires the Contractor to install and configure all the hardware and [...]
If the VSAT antenna needs to be place on a vessel, EMSA could use their own vessels or contract vessels [...]
07/05/2018
28
In order to be able to evaluate our responsibilities, could you please confirm that the relevant RPAS [...]
The RPAS are equipped with an autonomous waypoint driven control system for take-off, landing and in-flight [...]
07/05/2018
43
In order to ensure a fair competition with the current SATCOM Service Provider (having the best inside [...]
EMSA understands the complexity of the tender and for that reason already foresaw a bid submission period [...]
08/05/2018
38
In the "Template for Financial Offer", Lot 1 and Lot 2 sheets, is cell E18 value a ceiling for price [...]
The value of cell E18 is the data volume consumption per month used for the purpose of the calculation [...]
08/05/2018
15
Is it possible to make an inspection on site for a better understanding of installation, configuration [...]
An on-site inspection is not available during the tender process. Note that the sites themselves are [...]
23/04/2018