86
|
Definition of sanitary unit: A sanitary unit is a room in your building that contains several toilets [...]
|
Please see the new annex ‘XIX’ (Specifications of sanitary units) which has been published with additional [...]
|
13/08/2019
|
|
18
|
Do you prefer one document with all the answers to questions 1 – 8, or do you prefer a separate document [...]
|
EMA would prefer to receive one document with all the answers.
|
31/07/2019
|
|
75
|
Does the tenderer correctly understand that in part two a price must be entered for the consumbles requested [...]
|
Yes, the understanding is correct; the quotes for consumables should not include dispensers.
|
09/08/2019
|
|
6
|
Does this mean that the window cleaner must clean monthly interior glass and is this included separation [...]
|
The monthly cleaning services required comprises the internal glazing including separation glass, as [...]
|
26/07/2019
|
|
51
|
Fixed cost per one pest control visit. Each visit shall cover all aspects of the indicated duties specified [...]
|
Tenderers are requested to provide a fixed cost per pest control visit where each visit shall cover all [...]
|
06/08/2019
|
|
1
|
For completing above mentioned annex III, IX and XV can you please send them in word format.
|
For security reasons, the Agency is unable to provide annexes III, IX and XV in Word format. However, [...]
|
24/07/2019
|
|
78
|
For the indexation of prices you use a European standard which is serverely different than the usual [...]
|
Please see the response to question 77.
|
12/08/2019
|
|
33
|
For the KPI Audit overall score % you refer to a score sheet by which you measure Customer Satisfaction [...]
|
The score sheet is included in the SLA spreadsheet, please see score input in column K. The scores will [...]
|
02/08/2019
|
|
64
|
From our own experience we believe that the recycling station in your new building will be too small [...]
|
Tenderers are requested to present a proposal in line with the Agency requirements. Extra space could [...]
|
07/08/2019
|
|
41
|
From our own experience we know that a maximum of 1 complaint per month in a building with > 1.000 [...]
|
Complaints as described in the SLA are not user complaints. User complaints will be channelled through [...]
|
06/08/2019
|
|
97
|
Hand soap has been added to the Costing sheet in sheet 1 (Cleaning services) in section 2: Consumables [...]
|
A new costing sheet (v.4) has been published in which the formula is corrected. Tenderers must use this [...]
|
21/08/2019
|
|
38
|
How many sanitary units will there be in your building, and how many toilet pots and washbasins?
|
Could the economic operator please clarify what is meant with ‘sanitary units’?
|
06/08/2019
|
|
52
|
In order to collect waste efficiently we need a minimum of 2 and rather 3 high voltage power connections [...]
|
As per point d) central waste collection of section 3.1.5 (Waste management including confidential waste [...]
|
07/08/2019
|
|
26
|
In order to compile a correct list of proposed cleaning products, an overview of the finishing materials [...]
|
Tenderers should note that the EMA building is still a construction site. The below list of finishing [...]
|
02/08/2019
|
|
93
|
In order to determine an accurate price for cleaning services, the following information is required: [...]
|
For the requested information, please see Annex XX: Additional information. Please note that further [...]
|
20/08/2019
|
|
94
|
In order to provide you with an accurate price for deep cleaning, the following information is required [...]
|
For the requested information, please see Annex XX: Additional information, which has been published [...]
|
20/08/2019
|
|
68
|
In question 2 you have given us indicative measures per floor. In this list, the measures of floor 3 [...]
|
Please see below rectification: Floor 4 to 18: standard offices floors: surface 1,350 – 1,435 m2 + bathrooms [...]
|
08/08/2019
|
|
101
|
In the 'Technical Specifications' document it is stated that a completed Annex III (Declaration of honour [...]
|
The e-submission platform is designed in a way that it is compulsory to upload a Declaration on Honour [...]
|
27/08/2019
|
|
46
|
In the current situation all service desk enquiries (receipt, processing and feedback) are handled by [...]
|
The Agency considers that this question is not relevant to the submission of a proposal in response to [...]
|
06/08/2019
|
|
7
|
In the Invitation to tender you mention: "Economic operators interested in this contract are invited [...]
|
EMA is a multicultural organisation with English as the main working language, and English would therefore [...]
|
30/07/2019
|
|
100
|
In this section you ask for '1 small clinical waste bin and 1 sharp bin in the first aid room'. These [...]
|
The Agency cannot remove the supply and servicing of clinical waste bins and sharp bins from the requirements [...]
|
22/08/2019
|
|
99
|
In this section you ask for '25 x Sharp bins for each disabled toilet'. Are you sure you want sharpbins [...]
|
The requests for 25 sharp bins for each disabled toilet is based on what was in use in the Agency’s previous [...]
|
22/08/2019
|
|
98
|
In this section you ask for 47 Enzyme and urinal sleeves for each urinal. Can you specify this product [...]
|
The urinals are not waterless. The Agency does not prescribe the type of product to be used; this will [...]
|
22/08/2019
|
|
90
|
In your answer on question 43 you state that the contract start date is foreseen to be 01 December ‘19 [...]
|
Please see the response to question 87.
|
13/08/2019
|
|
58
|
In your RFP nothing is mentioned in regard to outside areas. Does this mean that outside areas are not [...]
|
The annual price for daily cleaning should include the main entrance area, access route, staircases and [...]
|
07/08/2019
|
|