Call for tenders' details

Please note that in the eSubmission homepage (Tendering data) the valid tendering dates are those in the second blue banner: tender deadline 31/07/2020 16:00; Opening of tenders: 03/08/2020 11:00. The warning refers to the old date 11/06/2020. Tenders submitted within 31/07/2020 16:00 will be considered in time. IMPORTANT Published in Questions&Answers tab clarifications on issues with uploading p7m offer files.
Title:
Retrofit of the Trigeneration System in JRC Ispra Site by Construction of a New ...
Contracting authority:
European Commission, Joint Research Centre - Ispra (JRC-IPR)
TED publication date:
10/03/2020
Time limit for receipt of tenders:
31/07/2020
Status:
Closed
Show filter parameters

Results per page: 10 | 25 | 50 180 Questions found, displaying 21 to 30.[First/Prev] 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 [Next/Last]
# Question Answer Last publication date Status
5
Clarification N.1) With reference to document “3-P.013273.2004 RE98005_02 Technical Specification — Scope [...]
The datasheet of the gas has been added to the tender documents
04/05/2020
6
Clarification N.2: the voltage of generators coupled to the cogenerators requested is 11.6 kV. For the [...]
The technical and financial offer shall be drafted according to technical specifications
04/05/2020
7
Clarification N.3 The installation will be subject to compliance with the requirements of the new network [...]
Conformity to CEI 0-16 and to TERNA grid code is requested according to technical specifications. It [...]
04/05/2020
8
Clarification N.4) The conditions to be considered for the three indicated operational scenarios (winter [...]
See attached clarification
04/05/2020
9
Clarification N.5) It is requested to confirm that the SAE system for continuous emissions monitoring [...]
We confirm that if ammonia or urea are used for the abatement of NOx, the SAE system shall monitor NH3 [...]
04/05/2020
10
Clarification N.6) In the document “EN-04-Technical Offer Form” on sheet 1 point 01. A description of [...]
We confirm that the building (design and construction) are not part of the scope of the contract; in [...]
04/05/2020
11
Clarification N.7: is it possible to receive drawings relating to the plants and sections of the building [...]
Drawings in dwg format will be uploaded in a zipfile. It must be taken into account that dwg files are [...]
04/05/2020
12
Clarification N.8) It is necessary to define the reference wet bulb temperature for the sizing of the [...]
The reference figures are: - Twb = 14 °C (MIN) - Twb = 17 °C (AVG) - Twb = 20 °C (MAX)
04/05/2020
90
Client is kindly requested to clarify if the the photovoltaic panels into the South façade of the new [...]
The photovoltaic system is not included in the scope of the supply. The point of connection has not been [...]
12/06/2020
14
With regard to the assessment of seasonal average yields and in particular the possibility of managing [...]
See attached clarification
04/05/2020