13
|
With reference to section “2.2.7.5 Service level definitions” of the “EN-Tender Specifications_9196_IT_Infrastructure [...]
|
ECDC has 5 systems with BIA level 4. There is no system at BIA level 5, as this level would mean no system [...]
|
01/02/2018
|
|
20
|
With reference to Section “3. IT Service Manager” of the Technical Annex 3 – Consultancy Profiles, in [...]
|
Your understanding is correct. The ITIL expert certification is sufficient.
|
01/02/2018
|
|
26
|
With reference to Section “3.2. Selection Criteria”. Could you please clarify whether relying on the [...]
|
Should any affiliated company be providing capacity to the tenderer to fulfil the selection criteria, [...]
|
05/02/2018
|
|
24
|
With reference to Section “3.2.1. Legal Capacity” of the Tender Specifications, the Tenderer shall provide [...]
|
All the members of the Consortium should provide Legal Entity form, as they will be jointly liable for [...]
|
05/02/2018
|
|
19
|
With reference to section “3.2.3. Technical and Professional Capacity” of the Tender Specifications, [...]
|
Indeed 2.2.6 gives details on the minimum security requirements that should be described under 3.2.3
|
01/02/2018
|
|
31
|
With reference to section “3.2.3. Technical and Professional Capacity” of the Tender Specifications, [...]
|
The limit of 3 pages should be applied regardless if single economic operator or consortium.
|
05/02/2018
|
|
35
|
With reference to section “3.2.3. Technical and Professional Capacity” of the Tender Specifications, [...]
|
The tenderer should submit the most relevant 3 references only.
|
05/02/2018
|
|
15
|
With reference to section “3.Interfaces, roles and responsibilities” of “EN-Technical Annex 4 Draft SLA [...]
|
1. You are free in the composition of your proposed team, but commonly one would expect that existing [...]
|
01/02/2018
|
|
17
|
With reference to section “4.1. Technical Proposal” of the Tender Specifications, for each required document [...]
|
CVs can be annexed and are excluded from the page limits. Cover page, table on content etc are included [...]
|
01/02/2018
|
|
74
|
With reference to section “4.2 Technical evaluation” of the Tender Specifications, the tenderer's proposal [...]
|
Your understanding is correct that the tenderer's proposal for a handover “appropriateness of the working [...]
|
22/02/2018
|
|