Данни на покана за участие в търг

Заглавие:
Услуги по разполагане/хостинг за център за данни за непрекъсната работа
Възлагащ орган:
European Maritime Safety Agency
Дата на публикация в TED:
06/04/2020
Краен срок за получаване на оферти:
11/05/2020
Статус:
Затворена
Показване на параметрите на филтъра

Results per page: 10 | 25 | 50 47 Въпроси found, displaying 11 to 20.[First/Prev] 1, 2, 3, 4, 5 [Next/Last]
# Въпрос Отговор Дата на последната публикация Статус
11
10. There’s no detail provided on this quote (pp. 17) – “Symantec NetBackup 52201x SUN rack with the [...]
It is a typo – please disregard the following words under that sentence: “SUN rack with the following [...]
22/04/2020
12
11. All the provided rack power is single-phase (for all racks)?
Yes
22/04/2020
13
12. With the use of 1 Eaton STS switch on DELL rack, how many equipment’s have only one input power supply [...]
Only one equipment connected to the Eaton STS switch on DELL rack has only one power supply.
22/04/2020
14
13. How many Cat.6 1000Base-T cables with RJ-45 or FO Cables are needed for each rack?
Tenderer shall only provide Internet cables (RJ45 and FO) as specified in the Tender Specifications ( [...]
22/04/2020
15
14. The layout of racks (position of each equipment on rack) in EMSA BCF (Madrid) shall be maintained [...]
Yes
22/04/2020
16
15. What type of structured cabling provided for each rack do you have in EMSA BCF (Madrid) – centralized [...]
Two racks contain network devices, and all the other racks have cables and fibres directly running from [...]
22/04/2020
17
16. On Appendix B (Price Calculation.xls) what’s the purpose of a pricing for a “4-racks configuration [...]
The purpose is to provide a price for “4-racks configuration” if needed during contract implementation [...]
22/04/2020
18
Does the maximum budget available include all the posibles renewals?
Yes, as per Article I.5.1 (Maximum amount of the FWC and maximum prices) of the draft Framework Contract [...]
24/04/2020
19
Which physical interfaces are to be considered for the Internet and Connectivity Layer 2? (i.e. 10G base-SR [...]
Connectors are specified in the Appendix A of the Tender Specifications attached to the Invitation to [...]
05/05/2020
20
A package of remote hands hours is to be quoted. Is it possible to have a forecast of hours per year? [...]
Effective amount of hours consumed per month and per year can vary greatly depending on needs, and there [...]
05/05/2020