Gegevens van de oproep tot inschrijving

Titel:
Huisvestings-/hostingdiensten met betrekking tot een gegevenscentrum voor bedrij...
Aanbestedende dienst:
European Maritime Safety Agency
Publicatiedatum op TED:
06/04/2020
Termijn voor de ontvangst van inschrijvingen:
11/05/2020
Status:
Afgesloten
Filterparameters tonen

Results per page: 10 | 25 | 50 47 Vragen found, displaying 21 to 30.[First/Prev] 1, 2, 3, 4, 5 [Next/Last]
# Vraag Antwoord Laatste publicatie Status
27
The article 21º of the DIRECTIVE 2014/24/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 February [...]
Please refer to answer provided to part I.
05/05/2020
26
MEO – SERVIÇOS DE COMUNICAÇÕES E MULTIMÉDIA, S.A., hereinafter also referred to as “MEO”, a public limited [...]
"As a general obligation stemming from the Treaty on the Functioning of the European Union and the Charter [...]
05/05/2020
25
The line to connect EMSA BCF and EMSA DC, could be a L3 line (IP or MPLS) or is required to be a L2 connection [...]
Line can be L3.
05/05/2020
24
On the Internet Connectivity - when filling the 5Gbps solution, the price should be the total amount [...]
Price shall be the total amount for the 5Gbps solution. Please note that all prices in the table are [...]
05/05/2020
23
Can all documents, that are to be uploaded by the tenderer, be digitally signed? including the ones where [...]
"According to Section 3 of Appendix I e-Submission Guidelines attached to the Tender Specifications, [...]
05/05/2020
22
The FWC, on I.3.3, states that "The FWC is concluded for a period of 48 months", and on I.3.5 that "The [...]
Power upgrades and downgrades shall be considered on a yearly basis (i.e., annual contract anniversary [...]
05/05/2020
21
The FWC, on I.3.3, states that "The FWC is concluded for a period of 48 months", and on I.3.5 that "The [...]
"Downgrades of physical space can be requested at each annual contract anniversary. The reference to [...]
05/05/2020
20
A package of remote hands hours is to be quoted. Is it possible to have a forecast of hours per year? [...]
Effective amount of hours consumed per month and per year can vary greatly depending on needs, and there [...]
05/05/2020
19
Which physical interfaces are to be considered for the Internet and Connectivity Layer 2? (i.e. 10G base-SR [...]
Connectors are specified in the Appendix A of the Tender Specifications attached to the Invitation to [...]
05/05/2020
18
Does the maximum budget available include all the posibles renewals?
Yes, as per Article I.5.1 (Maximum amount of the FWC and maximum prices) of the draft Framework Contract [...]
24/04/2020