11
|
In the frame of Task 3, what does “season” mean for you?
|
The ‘growing season’ comprises all biomass fluctuations within a calendar year. However, please note [...]
|
03/05/2019
|
|
15
|
Will the AOI be the same in a post-Brexit scenario?
|
The geographic coverage is defined in section 1.5.2 of the tender specifications. For downloading the [...]
|
03/05/2019
|
|
10
|
Reference to a section is lost in the sentence “The analysis shall focus on the suitability with regards [...]
|
The correct reference is ‘section 1.3 The role of HR VPP’.
|
03/05/2019
|
|
8
|
How should the growing season be defined? Should it be defined at Sentinel-2 tile level? Which is the [...]
|
A definition of the growing season shall be based on a scientifically peer reviewed and operationally [...]
|
03/05/2019
|
|
9
|
Is the expected output of Task 5 the products harmonised with the pre-existing products? Or only the [...]
|
The delivery of this task is a harmonisation strategy (a proposal of which must be included in the offer [...]
|
03/05/2019
|
|
6
|
Given the description of the requirements described in the TS and the existing platforms that give access [...]
|
Sentinel (2 A/B) data are ‘only’ the source for the HR VPP products and are not part of the deliverables [...]
|
02/05/2019
|
|
12
|
In sentence “The data access shall be integrated on https://land.copernicus.eu and fit into the design [...]
|
No, modifying land.copernicus.eu is not within the scope of this call for tenders. The goal is that the [...]
|
03/05/2019
|
|
5
|
In sentence “Besides the data access described under points 1) and 2) above, also a direct, server-internal [...]
|
Since the amount of data produced from this project is so vast, most of the expected downstream processing [...]
|
02/05/2019
|
|
7
|
is the infrastructure already created? Is the objective to develop a data access within the already existing [...]
|
It is very improbable that CLMS will set up on its own dedicated processing infrastructure. Most probably [...]
|
03/05/2019
|
|
1
|
Does the sentence “Besides the natively best possible grid resolution (it might depend on the selected [...]
|
All deliverables that are expected to be aligned to the HRL data (see figure 4 of the tender specifications [...]
|
02/05/2019
|
|