The deadline for receipt of tenders is extended by two weeks. The new deadline is 21/10/2019 at 23:59h (CET).
Título:
Asistencia técnica para apoyar la ejecución del proyecto de rehabilitación de la...
Poder adjudicador:
European Investment Bank (EIB)
Fecha de publicación del TED:
27/08/2019
Fecha límite de recepción de las ofertas:
21/10/2019
Estado:
Cerrada
Mostrar los parámetros del filtro

Results per page: 10 | 25 | 50 23 Preguntas found, displaying 1 to 10.[First/Prev] 1, 2, 3 [Next/Last]
# Pregunta Respuesta Fecha de la última publicación Estado
17
ToR Activity 2 and Section 4.1.1.2. As part of the detailed design stage were works tender documents [...]
The works tender documents were produced by the design consultant and according to the Activity 2 (3rd [...]
01/10/2019
18
ToR Activity 2 and Section 4.1.1.2. Have all the current Detailed Designs been reviewed since original [...]
No, detailed designs were prepared in 2017 and 2018.
01/10/2019
22
TA TOR Section 5.2. States max duration of the works is 4 years (48 months) including Defects Liability [...]
According to the ToRs the maximum duration of the TA contract is "72 months but not later than 28 December [...]
01/10/2019
1
Section A Instructions to Tenderers 6.1 (3) b): ‘CV should be no longer than 3 pages.’ then ‘In case [...]
Section A Instructions to Tenderers 6.1 (3) b) should be read as following: "CV should be no longer than [...]
01/10/2019
20
In the SCC reference is made to Annex VI,  Article 31 of the Cotonou Agreement signed, by all ACP [...]
Cotonou Agreement is a treaty between the European Union and the ACP countries. Malawi is one of the [...]
01/10/2019
8
Instructions to Tenders, Section 2. Timetable. We understand the urgency to move forward with this project [...]
The extension is granted. Thus, the deadline for receipt of tenders is 21 October 2019 at 23:59h. A corrigendum [...]
01/10/2019
2
Ref. Article 7.1 Please confirm that the indemnity given to the Contracting Authority in Article 7.1 [...]
This cannot be confirmed. The indemnity referred to in Article 7.1 covers “any claims and proceedings [...]
01/10/2019
3
Ref. Article 12.1 Please confirm that the indemnity given to the Contracting Authority in Article 12.1 [...]
This cannot be confirmed. The Article 12.2 covers only the indemnity for “actions, claims, losses or [...]
01/10/2019
4
Ref. Article 12.2 Will you accept that the Consultant’s liability with respect to any third party claims [...]
The limitation of liability for the benefit of the Consultant may not be applied for extra-contractual [...]
01/10/2019
5
Ref. Article 12.5 Will you accept that the Consultant’s overall liability under the contract is limited [...]
No.
01/10/2019