Dettagli del bando di gara

Titolo:
Contratti per i servizi RPAS VTOL per il monitoraggio delle emissioni e la sorve...
Amministrazione aggiudicatrice:
European Maritime Safety Agency
Data di pubblicazione nel TED:
25/04/2018
Termine per la ricezione delle offerte:
18/06/2018
Stato:
Chiuso
Mostra i parametri di filtro

Results per page: 10 | 25 | 50 9 Domande found, displaying all Domande .
# Domanda Risposta Data dell'ultima pubblicazione Stato
1
In section 4. General Configuration, capabilities and operational needs of VTOL Emissions Monitoring [...]
'For Lot 1, "Emissions Monitoring", the awarded tenderer may choose to perform the initial configuration [...]
30/05/2018
2
Could you please provide all templates in editable (.docx) formats ?
'The following documents have been uploaded in editable format under the "Document Library" of this Call [...]
04/06/2018
3
Any information that can be supplied on deployment locations, number of deployments, number of hours [...]
There is currently high demand for services from users as defined in §1.1.12 of EN-03 Tender Specifications [...]
05/06/2018
4
In 2.2.1.3 from EN-03 Tender Specifications Appendix 1 Technical Specifications, it is stated that "however [...]
It is up to the requesting user (as defined in §1.1.12 of EN-03 Tender Specifications Appendix 1 Technical [...]
05/06/2018
5
Under the “Tender Specifications” document at p10, s10 it states “If the tenderer intends to either subcontract [...]
The link is :http://emsa.europa.eu/work/procurement/item/128-documents-for-tenderer.html, containing: [...]
07/06/2018
6
“14.4 of the Tender Specifications (Economic and Financial Capacity – section criteria) states evidence [...]
Financial statements are considered closed after being audited (if required by the national legislation [...]
07/06/2018
9
Is it allowed for a Prime contractor to submit two separate replies based on two different solutions/ [...]
The tenderer may submit a technical tender for each lot (see question 8). EMSA understands that this [...]
12/06/2018
7
What is the likelihood of EMSA pushing the reply deadline by two weeks to allow companies to further [...]
The bid preparation period for this procurement already goes beyond the minimum required for an open [...]
12/06/2018
8
If a Prime contractor decide to bid for both Lots is it preferable to do it as two separate bids or one [...]
The contractor may decide to bid for one lot or for both lots and in any case he must follow the instructions [...]
12/06/2018