Sīkāka informācija par uzaicinājumu uz konkursu

Virsraksts:
IT infrastruktūras pakalpojumi
Līgumslēdzēja iestāde:
European Centre for Disease Prevention and Control (ECDC)
Publicēšanas datums TED:
20/12/2017
Piedāvājumu saņemšanas termiņš:
28/02/2018
Statuss:
Slēgts
Rādīt filtra parametrus

Results per page: 10 | 25 | 50 75 Jautājumi found, displaying 1 to 10.[First/Prev] 1, 2, 3, 4, 5, 6, 7, 8 [Next/Last]
# Jautājums Atbilde Jaunākais publicēšanas datums Statuss
6
The Technical Proposal must contain a proposal for a Service Level Agreement (SLA) based on Annex 4 ( [...]
A) Indeed there is a relationship in the desired service agreement and the technical offer, while there [...]
22/01/2018
1
1. The “Estimates for Work area 2 - ICT BackOffice” in tender specifications section 2.2.5.5 are summing [...]
1. The estimations in the work area Backoffice under 2.2.5.5. indeed add up to 101% due a rounding error [...]
22/01/2018
2
The technical annex 4 refer in the first page: […]In chapter 9 the mandatory Key performance indicators [...]
Indeed the reference should be to chapter 8 instead of chapter 9.
22/01/2018
3
Doc “Tender Specifications”, pg 28: Profiles required: “Server Administrator” but in “Technical Annex [...]
The profile name “Server administrator” and “System administrator” should be read as equivalent. In the [...]
22/01/2018
4
Will you provide a template for the proof of references to projects ?
ECDC will not provide a template. The contractor may choose himself a simple template.
22/01/2018
5
Do you confirm that the estimation of the annual workload in man-hours (for instance 90 for the frontoffice [...]
It is correct, the right column gives an indication of work hours outside office hours and outside the [...]
22/01/2018
7
Online the time limit says last day to hand in our offer is 16/02/2018 and in the material provided to [...]
The official deadline for submission of tenders is 28/02/2018, this will be corrected as soon as possible [...]
22/01/2018
8
Can you please give detailed information about the applications to host within this FwC, regarding data [...]
You find information about the hosting service provided by the Backoffice team under 2.2.4.2 in the tender [...]
25/01/2018
10
In the case of 18 penalty points (and higher) no other consequence than "Possible termination of FWC" [...]
It is correct, in the situation of 18 or more penalty points and that ECDC would not cancel the FWC, [...]
26/01/2018
9
The TS, page 13 Minimum Requirements, stipulates: "1. All contractor’s consultants working for ECDC need [...]
All contractors consultants working for ECDC need to have an ITIL foundation certification. This is applicable [...]
26/01/2018