Gegevens van de oproep tot inschrijving

Titel:
Monitoren van digitale transformatie en sleuteltechnologieën
Aanbestedende dienst:
Executive Agency for Small and Medium Sized Enterprises (EASME)
Publicatiedatum op TED:
23/03/2018
Termijn voor de ontvangst van inschrijvingen:
04/05/2018
Status:
Afgesloten
Filterparameters tonen

Results per page: 10 | 25 | 50 27 Vragen found, displaying 1 to 10.[First/Prev] 1, 2, 3 [Next/Last]
# Vraag Antwoord Laatste publicatie Status
13
Page 19 of terms of reference states that contractor should provide content developed in WP1 to 3, including[...]
The indicators which are referred to under Task 2.8 shall be indeed regularly updated according to the[...]
18/04/2018
2
Page 20 of ToR states: “This task may require up to 12 on-site technical meetings and reviews (appropriate[...]
The on-site technical meetings are planned to be held at Commission/EASME premises. No costs are expected[...]
13/04/2018
10
Page 20 of ToR states: “The Contractor is expected to regularly report user improvement suggestions.”[...]
The timing shall depend on the type of suggestions. In case a user notifies the website of a serious [...]
18/04/2018
1
Page 20 of ToR states: “The Contractor is supposed to provide user support via electronic mail in 24 [...]
The contractor is requested to provide both kinds of user support, on user access and on content and [...]
13/04/2018
14
Page 20 of ToR states that "The scope and the utility of the KETs Observatory, mapping of KETs Technology[...]
Please see task 6.5. of the ToR for details on expected results, deliverables, timing etc. The term “[...]
18/04/2018
5
On page 22 of ToR, related to task 3.2, it is stated that “On the basis of the work carried out under[...]
Yes, these reports are related to the list of deliverables indicated at point 3 under WP3 (page 46). [...]
13/04/2018
3
Page 23 of ToR, related to task 3.2, states that “The Contractor shall test and further substantiate [...]
It will be the responsibility of the contractor to organize all workshops and to cover all related costs[...]
13/04/2018
6
Page 23 of ToR (task 3.3.): “To produce the reports, the following activities must be undertaken: (a)[...]
The contractor is requested to produce 15 reports as specified on page 46. The reference to 12 reports[...]
18/04/2018
19
Page 24 of ToR (Task 3.4) states “As a result of task 3.3, promising KETs based products/applications[...]
The actions described under task 3.4. (programmes and funding schemes available at European level, gaps[...]
18/04/2018
22
Page 24 of ToR (Task 3.5) states “The Contractor shall develop a methodology that will regularly scan[...]
• Are these workshops a previous activity to the 3.3 to identify products/services? Yes, as the workshops[...]
19/04/2018