Call for tenders' details

Title:
Housing/Hosting Services for a Business Continuity DataCentre
Contracting authority:
European Maritime Safety Agency
TED publication date:
06/04/2020
Time limit for receipt of tenders:
11/05/2020
Status:
Closed
Show filter parameters

Results per page: 10 | 25 | 50 47 Questions found, displaying 1 to 10.[First/Prev] 1, 2, 3, 4, 5 [Next/Last]
# Question Answer Last publication date Status
1
Due to COVID-19 and measures taken by EU states' governments, we are applying a work-from-home approach [...]
The services to be procured under this procedure are needed to replace as soon as possible the services [...]
21/04/2020
2
1. Regarding the Datacentre move, EMSA shall perform a list of tests to qualify that the reboot on the [...]
Yes, reboot tests are requested as part of the all-inclusive move. EMSA Personnel might assist in this [...]
22/04/2020
3
2. Some weeks preceding the move, all applications that use EMSA BCF (Madrid) as the main site will be [...]
Yes, site will be emptied of its applications by EMSA Team before the move will start.
22/04/2020
4
3. What’s the maximum time that EMSA BCF (Madrid) systems could remain shutdown to perform the move?
EMSA BCF systems should not stay in shutdown for more than 10 calendar days. The longer the shutdown [...]
22/04/2020
5
4. All rack equipment’s (except Oracle Exadata and Netapp array) have active support contracts that cover [...]
Equipment has active support contracts, which however does not cover for damages provoked by a move – [...]
22/04/2020
6
5. The Oracle Exadata X5-2, Netapp storage array and “TESTA” rack shall be moved on different and segregated [...]
Not necessarily.
22/04/2020
7
6. Does TESTA rack requires any specialized professional services?
As explained in the Tender Specifications (section 2.1, page 6), TESTA rack might have to be moved without [...]
22/04/2020
8
7. How many racks shall be provided by us on our Datacentre to EMSA equipment’s (excluding EXADATA and [...]
EMSA has its own racks, and doesn’t need any rack provided by the Tenderer. EMSA own racks shall be moved [...]
22/04/2020
9
8. Does CCTV monitoring the cage will be provided by EMSA, regarding this quote on Specification Document [...]
Yes – the Tenderer shall confirm that it is possible for EMSA to activate its own camera monitoring system [...]
22/04/2020
10
9. What requirements are requested to access control for the cage?
Tenderer shall propose its control measures available for accessing the datacentre and the cage.
22/04/2020