1
|
Dear Sir/Madam, With regard tot he terminals that will need to go onto the 2 different types of RPAS. [...]
|
1. The details of the first type of RPAS are: TAKE-OFF WEIGHT / MASS UP TO 150 KG (MAXIMUM) ENDURANCE [...]
|
11/04/2018
|
|
2
|
Dear Sir/Madam, Can we request an area of operation that the RPAS will require to have BLOS communications [...]
|
The areas of operation can be all sea areas surrounding the European Union with an EU or EFTA country [...]
|
11/04/2018
|
|
3
|
With reference to Paragraphs 2.2.2 & 2.2.3 & 8.1.2 in the Tender Specification document (EN-02 [...]
|
The Contracting Authority may award several FWCs per lot. The mechanism for implementing the FWC per [...]
|
20/04/2018
|
|
4
|
With reference to the second bullet point in paragraph 8.1.2 in the Tender Specification document (EN [...]
|
During the implementation of the FWC, the Contractors may add new terminals in order to ensure SATCOM [...]
|
20/04/2018
|
|
5
|
Can the same company be subcontractor in more than one tender to the FWC?
|
Please refer to point 10 of the Tender Specifications - economic operators on the market are free to [...]
|
20/04/2018
|
|
6
|
To provide an offer in Mbps, it is required to establish a link budget. Can you provide details about [...]
|
The details of the terminals currently used by the Agency can not be provided. The terminal requirements [...]
|
20/04/2018
|
|
7
|
Can you confirm: - The method used to evaluate the link availability (exclusions, periods of time to [...]
|
-The Bidders can select the method that they consider more suitable to evaluate the link availability [...]
|
20/04/2018
|
|
8
|
Are there alreary routers, and of which type, aboard the current fleet of RPAS ? Will it be the responsibility [...]
|
The Agency operates with different RPAS platforms, most of them already have routers on-board to distribute [...]
|
20/04/2018
|
|
9
|
As some French overseas territories are included in the EU territory according to international treaties [...]
|
As per Tender Specifications: 1.1.8 and Appendix 1: 2.1: Areas of operation can be all sea areas surrounding [...]
|
20/04/2018
|
|
10
|
a) Will EMSA please verify the SATCOM equipment the vendors propose for Lot 1, (2 Mbps data rate) is [...]
|
a) In principle both lots are intended for fixed wing RPAS. The Agency's current platforms are medium [...]
|
20/04/2018
|
|