Ajánlati felhívás részletei

Cím:
Irodaköltöztetési szolgáltatások az EBH számára
Ajánlatkérő:
European Banking Authority (EBA)
A TED-es közzététel dátuma:
07/02/2019
Az ajánlatok kézhezvételére vonatkozó határidő:
11/03/2019
Státusz:
Lezárt
Szűrési paraméterek mutatása

Results per page: 10 | 25 | 50 15 Kérdések found, displaying 1 to 10.[First/Prev] 1, 2 [Next/Last]
# Kérdés Válasz Legutóbbi közzététel dátuma Státusz
1
We have seen the procurement procedure for the office move of the EBA has been opened and published again [...]
Yes, the site visit at the EBA's UK offices is important and compulsory for all tenderers. There are [...]
13/02/2019
2
Hi As anyone realised there is a restriction on HGVs from 12.00 am Saturday until 12.00 pm Sunday, or [...]
Due to restrictions of the circulation regarding Heavy Goods Vehicles (HGV) in France, the planning for [...]
22/02/2019
3
Please confirm the volume of filing to be moved is based on the assumption all of the existing cabinets [...]
The volume of filing to be moved is based on the assumption that all of the existing cabinets / storage [...]
28/02/2019
4
Please confirm the move contractor will be required to pack and unpack the kitchen china / glass.
The move contractor is required to pack and unpack the kitchen crockery, glassware and cutlery.
28/02/2019
5
Please confirm EBA Staff will pack/unpack all filing and how long a crate hire period should be included [...]
All filing will be packed/ unpacked by EBA staff. Crate hire period should be from 6 May 2019 up to and [...]
28/02/2019
6
Please confirm how many personal crates should be provided for staff to pack their pedestal contents [...]
One personal crate per person. Crate hire period should be from 6 May 2019 up to and including Friday [...]
28/02/2019
7
In respect to one the goods lift in the delivery location, and on the above noted dates, can the FM Team [...]
No works are currently planned over Phases 1 and 2. Notification will be given to the Building Manager [...]
01/03/2019
8
Can the EBA team confirm what cabling provisions will be made in Paris?
Kettle leads for desktop PC, monitor and patch leads will be in situ on the desk.
01/03/2019
9
Can the Facilities team confirm whether parking can be permitting in the two loading bays showed to us [...]
At Europlaza, only one vehicle at a time may be parked in the loading bay at Level -1.
01/03/2019
10
With regards control of the lift during this delivery period and on the basis of the number of floors [...]
Tenderers should not assume that such control will be granted by Europlaza management.
01/03/2019