# Question Answer Last publication date Status
31
Given the temperature range required, is it correct to say that the climate control system should be [...]
Yes, it is correct to consider that climate control system is required. Climate control system shall [...]
07/09/2015
32
Is it possible to have a description of critical and non-critical loads as well as the management mode [...]
Critical loads include specific systems that will remain operational during an outage. Typical "critical [...]
07/09/2015
33
In the penultimate paragraph, what is meaning of the term "Smooth" relatively to connections and disconnections [...]
Please see the response to question 27
09/09/2015
34
In the formula for the calculation of liquid damages, the value of "d" is given by the sum of the total [...]
"d" refers to each duration mentioned in the article I.2.3. (respectively: 5 months, 2 years, twelve [...]
09/09/2015
35
Given that the two months of delivery of the materials are essential (see the answer to question 22), [...]
Please refer to the supplementary answer to the question 22
09/09/2015
36
Chiediamo altresì di confermare l’assenza di penali in caso di consegna del BESS oltre il limite dei [...]
Se il contraente non adempie gli obblighi contrattuali entro i termini fissati dal contratto, ferma restando [...]
14/09/2015
37
On page 4 of the technical specifications, it indicates that the system should permit a "smooth" and [...]
The system can be operated in 3 different modes (see requirements A4, A5, A6, B1, B9, C1, C5, C10 and [...]
14/09/2015
38
On page 4 of the technical specifications, it indicates that the system must permit a "smooth" and automatic [...]
An electromechanical switch is allowed as there is no negative impact for the technical requirements.
14/09/2015
39
In the document "Draft Contract supply and maintenance" on page 11 section II.1.7, relative point (a) [...]
By derogation to the provisions of the article II.1.7. "General provisions concerning supplies", the [...]
15/09/2015
40
Is it possible to participate in the tender as contractor and also being subcontractor for other contender [...]
Yes, providing that this situation does not hinder, limit or distort competition. The Contracting Authority [...]
17/09/2015