Annex I Part 2 Technical Specifications page 10 - 2.2. Scalability requirements - 1. "…50.000 C-ITS stations"
a) Could you please indicate the maximum number of Authorisation Tickets (Certificates) for the 50.000 C-ITS stations per year. b) Could you please indicate the spread for the number of C-ITS stations for WKP2 and WKP3 if applicable.
24/05/2019
CORRIGENDUM INSTEAD OF 'However, please refer also to point 1.2 Scalability Requirements within the table in Annex I - Part 1: Administrative Annex, Section 2.5.1 on page 13/14 to find more details on how the amount of provided authorisation tickets will be evaluated, beyond the necessity of fulfilling the minimum requirements defined in Annex I - Part 2: Technical Specifications, page 10.' IT SHALL READ: 'However, please refer also to point 1.2 Scalability Requirements within the table in Annex I - Part 1: Administrative Annex, Section 2.5.1 on page 13/14 to find more details on how the amount of provided support for C-ITS stations will be evaluated, beyond the necessity of fulfilling the minimum requirements defined in Annex I - Part 2: Technical Specifications, page 10.'
24/05/2019
Ad a) Annex I - Part 2: Technical Specifications does not define a maximum amount of Authorisation Tickets to support. However, please refer also to point 1.2 Scalability Requirements within the table in Annex I - Part 1: Administrative Annex, Section 2.5.1 on page 13/14 to find more details on how the amount of provided authorisation tickets will be evaluated, beyond the necessity of fulfilling the minimum requirements defined in Annex I - Part 2: Technical Specifications, page 10. Ad b) WKP2 and WKP3 has the same minimum amount as WKP2, namely 50.000 C-ITS stations that are to be supported by the internal EA and AA. (compare with the first sentence of Chapter 2.2 of Annex I - Part 2: Technical Specifications, page 10 which says 'For the operation of the service in WPK1, WPK2 and WPK3 the contractor shall be able to supply a scalable service, at least fulfilling the following requirements as a minimum: 1. The internal EA and AA shall be able to support a minimum of 50.000 C-ITS stations with the provision of related certificates as specified in [1].'