Question details
Subject
Methodology and Timetable
Question
Once analysed the Tender Specifications, we have realized that some proposed milestones in the timetable don't match with the methodology that we are thinking for the consultancy services. In this sense, could it be possible to change some of timetable milestones justifying this change with the proposed methodology? (We are thinking in postpone the interim report and the interim meeting further than month 5)
Answer
24/07/2013
In accordance with section 6 of the Invitation to Tender, the terms and conditions set out in the tender documents (i.e. Invitation to Tender, Tender Specifications and Draft Service Contract) cannot be altered.