Teema
Ratio of Projects
Küsimus
On page 10 point 4.2.1 of the ToR it is stated that: "The Consultant will identify and propose a pipeline of at least 20 candidate projects, of which a majority should be solid waste projects and the remaining representing the wastewater and storm water sectors". Can you please clarify if there is any specific proportion/ratio foreseen? (E.g. shall solid waste projects constitute 60% and 40% for wastewater and storm water sectors?)
Vastus
04/11/2019
The contracting Authority confirms that there is no pre-defined ratio between the three sectors other than that at least 50% of the projects shall be in the solid waste sector.