Renseignements sur l'appel d'offres

Intitulé:
Cooperative Intelligent Transport System EU Root Certification Authority includi...
Pouvoir adjudicateur:
European Commission, Joint Research Centre - Ispra (JRC-IPR)
Date de publication sur TED:
19/04/2019
Date limite pour la réception des offres:
07/08/2019
Statut:
Fermé
Statut
10/07/2019
15/07/2019
English (en) italiano (it)
Détails de la question
Log Management and Log Collection
Based on the cellar_9a2fe08f-4580-11e9-a8ed-01aa75ed71a1.0005.02_DOC_4.pdf - chapter 5.4, is it necessary to use a log management system, also the log management infrastructure must be in HA, for each environment?
15/07/2019
1.) The contractor can implement a log management system to address the requirements of 5.4, but it is not mandatory to use a log management system, as long as the requirements of 5.4 are fulfilled. 2.) The log management infrastructure does not need to be available in high availability (HA) for each environment. However, all requirements of chapter 5.4.4 of [1] of Annex I - Part 2:Technical Specifications must be fulfilled.