Sonraí an Ghlao ar Thairiscintí

Teideal:
IT Infrastructure services
Údarás Conarthachta:
European Centre for Disease Prevention and Control (ECDC)
Dáta foilsithe TED:
20/12/2017
Dáta deiridh le haghaidh tairiscintí:
28/02/2018
Stádas:
Dúnta
Stádas
26/01/2018
01/02/2018
English (en)
Sonraí na Ceiste
KPIs
With reference to section “8.List of Key Performance Indicators” of “EN-Technical Annex 4 Draft SLA” the KPI with Code/Identifier “GO-03” mentions “ECDC Satisfaction Scores by the process and contractor managers listed in tender specifications 2.5.1.” However, the section 2.5.1 is missing. Could you please clarify which section are you referring to?
01/02/2018
You are right that the reference is wrong, as the list of contract managers is now in the document “EN-Technical Annex 4 Draft SLA” under chapter 3 “Interfaces, roles and responsibilities” So from these contract managers a monthly simple satisfaction feedback need to be collected.