Informações relativas ao concurso
Estado
Data de envio
02/08/2019
Data de resposta
07/08/2019
Língua
Estado
Respondida
Informações relativas à questão
Assunto
Technical specifications for open invitation to tender Par. 3.1.5 Waste Management
Questão
In order to collect waste efficiently we need a minimum of 2 and rather 3 high voltage power connections (16 A slow fuse). Will you be able to provide this in your new building?
Resposta
07/08/2019
As per point d) central waste collection of section 3.1.5 (Waste management including confidential waste) in the technical specifications, the room is equipped with 6 x 2 power outlet (240 V) including one high voltage power outlet (400V - 16Amp). The Agency cannot provide more power connections at this stage. However, the installation of additional power connections might be considered in the future.