Call for tenders' details

Title:
Entry Exit System Land Border Pilot
Contracting authority:
European Border and Coast Guard Agency (Frontex)
TED publication date:
12/08/2020
Time limit for receipt of tenders:
21/09/2020
Status:
Closed
Status
11/09/2020
14/09/2020
English (en)
Question details
Annex II_1 Terms of Reference Lot 1: Entry Exit System Land Border Pilot in Bulgaria Section 3.4 d And Annex II_2 Terms of Reference Lot 2: Entry Exit System Land Border Pilot in Spain Section 3.4 d
Your statement in the procurement reads: The ‘core-system’ shall be able to manage the concurrent deployment of at least two additional core-systems kiosks or gate sets in the same location to scale up the system capabilities Scaling up will require from the host the provision of additional electric power, physical security, and extra broadband connection to the Web (wireless or cabled) Question: In case FRONTEX decides to scale up the system, what would be the resolution time for the additional equipment?
14/09/2020
Regarding Phase Two implementation, the resolution time for scaling up should be within a month of a written request.